Olkiluoto nuclear power plant 3

Operating Finland
Gross capacity
1,720MW

Olkiluoto nuclear power plant 3 is a pressurised water reactor unit at Olkiluoto nuclear power plant in Finland rated at 1,720 MW gross. It is operating. Commercial operation began 16 Apr 2023.

Corrected against a later source

GNPT gives a commercial operation date of 1 January 2022, before the unit's own grid connection on 12 March 2022. The World Nuclear Association database lists regular (commercial) operation from 16 April 2023, after the trial-operation period that followed the grid connection. The start year follows the commercial date.

commercial_operation: 2022-01-01 → 2023-04-16 · World Nuclear Association, Nuclear Reactor Database, Olkiluoto 3 · verified 2026-10-22

GNPT gives a commercial operation date of 1 January 2022, before the unit's own grid connection on 12 March 2022. The World Nuclear Association database lists regular (commercial) operation from 16 April 2023, after the trial-operation period that followed the grid connection. The start year follows the commercial date.

start_year: 2022 → 2023 · World Nuclear Association, Nuclear Reactor Database, Olkiluoto 3 · verified 2026-10-22

Specification
Reactor type Pressurised water reactor (PWR)
ModelEPR
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,720MW
Net capacity (reference)1,600MW
Net capacity (design)1,600MW
Thermal output4,300MWt
NSSS vendorFramatomeall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteOlkiluoto nuclear power plant
Unit3
CountryFinland
OwnerTeollisuuden Voima Oyj100%
OperatorTeollisuuden Voima
Coordinates 61.2356, 21.4372
Live status Nord Pool UMM, declared availability
State
…
loading
Available capacity
…
Declared: an outage or limit the operator has announced. No outage declared is not a confirmation that the unit is running. See every unit outside the US.
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 12 Aug 2005Construction start
  2. 21 Dec 2021First criticality
  3. 12 Mar 2022Grid connection
  4. 16 Apr 2023Commercial operation

Other units at Olkiluoto nuclear power plant

UnitStatusGross MW
Olkiluoto nuclear power plant 1 Operating 920
Olkiluoto nuclear power plant 2 Operating 920
Olkiluoto nuclear power plant 4 Cancelled 1,830

Other EPR units

20 units worldwide share this model designation.

UnitCountryStatusGross MW
Flamanville nuclear power plant 3 France Operating 1,650
Amarillo nuclear power plant 1 United States Cancelled 1,710
Amarillo nuclear power plant 2 United States Cancelled 1,710
Bell Bend nuclear power plant United States Cancelled 1,600
Callaway nuclear power plant 2A United States Cancelled 1,600
Calvert Cliffs nuclear power plant 3 United States Cancelled 1,600
Idaho Energy Complex nuclear power plant United States Cancelled 1,600
Jaitapur nuclear power plant 1 India Announced 1,730
Jaitapur nuclear power plant 2 India Announced 1,730
Jaitapur nuclear power plant 3 India Announced 1,730
Jaitapur nuclear power plant 4 India Announced 1,730
Jaitapur nuclear power plant 5 India Announced 1,730

Sources