The nuclear fuel chain

Getting uranium from the ground into a reactor takes four industrial steps, and each one narrows. Roughly twenty countries mine uranium. Five plants on earth convert it to the gas that enrichment requires. Four organisations do essentially all of the enrichment. That funnel, not the reactors, is where the nuclear industry's real concentration lies.

See every mine, plant and repository on a map → · Does supply cover the fleet? · Fuel at home, by country

Mining ore → yellowcake 20 countries KazakhstanCanadaNamibiaAustraliaUzbekistan Conversion U₃O₈ → UF₆ 5 operators CNNCOranoCamecoRosatomConverDyn Enrichment 0.71% → 3–5% U-235 4 operators RosatomUrencoCNNCOrano Fabrication UF₆ → assemblies 12 operators FramatomeWestinghouseTVELGlobal Nuclear FuelCNNC Reactor 419 operating 32 countries United StatesFranceChinaRussiaSouth Korea Back end storage · reprocessing 4 operators OranoJNFLRosatomIndia (DAE, 4 plants) natural uranium used fuel
Band height is proportional to the number of organisations operating each stage. The chain is wide at the ends and pinched in the middle: five conversion plants and four enrichment operators stand between every uranium mine on earth and every reactor that runs on the result.

Concentration at each stage

StageWorld capacityTop 3 shareWhoFacilities here
Mining and milling 60,213tU/yr (2024) 75% Kazakhstan (all operators), Canada (all operators), Namibia (all operators) 47
Conversion 62,000tU/yr as UF6 (2022) 69% CNNC, Orano, Cameco 10
Enrichment 68,076tSWU/yr (2025) 88% Rosatom, Urenco, CNNC 25
Fabrication 14,912tHM/yr (2022) 60% Framatome, Westinghouse, TVEL 31
HALEU n/a - - 6
Interim storage n/a - - 10
Reprocessing 3,860tHM/yr (2022) 75% Orano, JNFL, Rosatom 4
Geological disposal n/a - - 21
Depleted uranium n/a - - 2

Does supply cover the fleet?

Today's operating reactors need about 64,200 tonnes of uranium, 51,200 thousand SWU of enrichment and 10,330 tonnes of fabricated fuel a year. Worldwide, capacity covers each stage except mining, where the shortfall is met from stockpiles and secondary supply. Take out what Russian and Chinese state companies hold and set it against the reactors outside those two countries, and conversion to uf6 and enrichment fall short: 73% of the need for conversion to uf6 and 63% of the need for enrichment.

Worldwide Outside Russia and China 100% of need Mining Mining: 60,213 tU against a need of 64,219 94% Mining, outside Russia and China: 55,875 tU against 50,376 111% Conversion to UF6 Conversion to UF6: 62,000 tU against a need of 60,875 102% Conversion to UF6, outside Russia and China: 34,500 tU against 47,199 73% Enrichment Enrichment: 68,076 tSWU against a need of 51,230 133% Enrichment, outside Russia and China: 25,154 tSWU against 39,721 63% Fabrication, light water fuel Fabrication, light water fuel: 14,912 tHM against a need of 6,984 214% Fabrication, light water fuel, outside Russia and China: 10,752 tHM against 5,415 199% Fabrication, heavy water fuel Fabrication, heavy water fuel: 4,946 tHM against a need of 3,344 148% Fabrication, heavy water fuel, outside Russia and China: 4,946 tHM against 3,177 156%
Capacity (production, for mining) as a share of what the operating fleet needs each year. Bars past 220% are cut at the edge.
StageFleet needs a yearWorld capacityHeld in Russia or ChinaReactors outside them needCapacity outside them
MiningProduction, not capacity. The gap is met from inventories and secondary supply. 64,219 tU 60,213 (2024) 7% 50,376 55,875 (111%)
Conversion to UF6Heavy water reactor fuel needs no UF6 and is left out of the need. 60,875 tU 62,000 (2022) 44% 47,199 34,500 (73%)
Enrichment 51,230 tSWU 68,076 (2025) 63% 39,721 25,154 (63%)
Fabrication, light water fuelAssembly designs are not interchangeable, so spare capacity in one design does not cover another. 6,984 tHM 14,912 (2022) 28% 5,415 10,752 (199%)
Fabrication, heavy water fuel 3,344 tHM 4,946 (2022) - 3,177 4,946 (156%)

How the need is estimated. This is the site's own estimate, not a published figure. Each operating reactor's thermal rating, run at the 2024 world average capacity factor of 83% (World Nuclear Association, World Nuclear Performance Report 2025), is divided by a typical discharge burn-up: 45 GWd/t for light water fuel enriched to 4.5% with tails at 0.22%, and 7.5 GWd/t for natural uranium in heavy water reactors (World Nuclear Association, The Nuclear Fuel Cycle). Real cores vary with cycle length and fuel management. 3% of operating thermal capacity (AGR, FBR, HTGR, MAGNOX, RBMK) has no published typical burn-up and is left out, as are first cores for new units. As a check, the estimate gives 6,980 t of light water and 3,340 t of heavy water fuel a year against the "about 7,000" and "3,000" tonnes the World Nuclear Association gives, and 64,200 tU against the 68,920 tU it puts on 2025 requirements (source). "Held in Russia or China" is the capacity of Rosatom, TVEL and CNNC in the operator tables, and for mining the production of the two countries. Units under construction would add about 13,500 tU and 11,100 thousand SWU a year once running.

Which countries can fuel their own reactors →

The stages

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.