Where nuclear waste will finally go

Ten repositories are operating worldwide and not one of them takes commercial spent fuel. Nine take low and intermediate level waste, which several countries have been burying for decades; the tenth takes transuranic waste from the American weapons programme. For the fuel itself, Finland's Onkalo is built and awaiting its operating licence, Sweden is under construction at Forsmark, Canada selected a site in 2024 after fifteen years of consent-based siting, and everyone else is somewhere between planning and paralysis.

Facilities listed
21
across 14 countries
Operating
10
5 under construction
Planned
3
3 closed or abandoned
Operating capacity
800,000
drums, where published

The engineering has not been the hard part. The Finnish and Swedish KBS-3 method seals fuel into copper canisters, surrounds them with bentonite clay that swells when wet, and places them in tunnels hundreds of metres down in rock that has been geologically stable for a billion years. It has been studied for four decades and no serious technical objection has survived.

What has failed is consent. Repository siting has collapsed politically in more countries than it has succeeded in. Yucca Mountain absorbed two decades and billions of dollars, was selected by an act of Congress rather than by a search, never received a single fuel assembly, and lost its funding in 2010. Germany spent thirty years on Gorleben before abandoning it and restarting the search from a blank map.

The programmes that worked did the opposite. Finland and Sweden spent decades building local agreement before they moved rock, and both host municipalities volunteered. Canada's process ran fifteen years and ended with a willing community and a willing First Nation. What those three have in common is not geology, which is unremarkable in each case, but that nobody was told where the waste was going.

Most waste is not spent fuel, and most of it already has somewhere to go. Drigg in Cumbria has been taking low level waste since 1959, Finland has been putting it underground since 1992, and Sweden's SFR sits fifty metres below the Baltic seabed. These places work, and they are routinely counted alongside spent fuel repositories in a way that makes the problem look closer to solved than it is. The Waste Isolation Pilot Plant in New Mexico is the only deep geological repository in the world receiving waste, and it takes transuranic waste from the weapons programme. It is proof the concept works, not proof the harder problem is finished.

Germany is the record of what failure costs. Asse II took 47,000 cubic metres of waste into a salt mine on the assumption that salt stays dry. Water entered, and the decision now is to retrieve all of it, at an estimated 4.7 billion euros merely to be ready to begin in 2033. Morsleben, 37,000 cubic metres, is being sealed with its contents in place, the opposite decision. Konrad, licensed in 2002, is still being built.

Why this stage is a chokepoint

The bottleneck is consent, not capacity, geology or money. There is no shortage of suitable rock: stable formations exist in almost every country with a nuclear programme. What is scarce is a community that will accept the material, and the programmes that found one spent between fifteen and forty years doing so. That is the timescale everything else in this stage runs on, and it is why a country that starts now is not opening a repository this half-century.

What each repository actually takes

There are 10 operating repositories in the world. 9 of them take low and intermediate level waste, one takes transuranic waste from the American weapons programme, and none takes commercial spent fuel or high level waste. That distinction does most of the work on this page. Burying waste that does not generate heat is a solved problem that several countries have been doing for decades; burying waste that does is a problem no country has finished solving, and the two are routinely reported as though they were the same activity.

How long it takes

Every deep repository for heat-generating waste has taken decades from choosing a site to the first waste, and most dates still ahead have already moved. Sweden chose Forsmark in 2009 and expects to operate in the early 2030s; Switzerland's decisions run to a possible referendum in 2031; France does not expect to commission Cigéo before 2050. The one American deep repository that operates takes only defence waste, and the one meant for commercial spent fuel was abandoned after its licence application.

1990200020102020203020402050 today Onkalo Finland, spent fuel Disposal expected to begin: 2026 (expected) Forsmark Sweden, spent fuel Site selected: 2009Licence application: 2011Government approval and licence: 2022Application to excavate underground: 2025Operation expected: 2030 to 2033 Cigéo France, high level waste Construction licence application: 2023Regulator's favourable opinion: 2025Public inquiry: 2026Commissioning not expected before: 2050 (expected) Canada (Ignace) Canada, spent fuel Siting process began: 2010Site selected: 2024 Nördlich Lägern Switzerland, spent fuel General licence application: 2024Federal Council decision: 2029 (expected)Parliament: 2030 (expected)Possible national referendum: 2031 (expected) Konrad Germany, low and intermediate level Licensed: 2002Completion: 2030 to 2033 Waste Isolation Pilot Plant United States, defence transuranic waste First waste: 1999 Yucca Mountain United States, spent fuel Designated by Congress: 1987Licence application: 2008Funding withdrawn: 2010 Beishan (research lab) China, high level waste Repository not expected before: 2050 (expected)
Filled: happened. Hollow: the date the operator or government is aiming for. Hover a point for the milestone. Yucca Mountain's line is greyed because the project was abandoned.
RepositoryMilestones
Onkalo Finland 2026disposal expected to begin (expected)
Forsmark spent fuel repository (KBS-3) Sweden 2009site selected; 2011licence application; 2022government approval and licence; 2025application to excavate underground; 2030-2033operation expected (expected)
Cigéo France 2023construction licence application; 2025regulator's favourable opinion; 2026public inquiry; 2050commissioning not expected before (expected)
Canadian deep geological repository Canada 2010siting process began; 2024site selected
Nördlich Lägern Switzerland 2024general licence application; 2029federal council decision (expected); 2030parliament (expected); 2031possible national referendum (expected)
Konrad Germany 2002licensed; 2030-2033completion (expected)
Waste Isolation Pilot Plant United States 1999first waste
Yucca Mountain United States 1987designated by congress; 2008licence application; 2010funding withdrawn
Beishan underground research laboratory China 2050repository not expected before (expected)

Dates come from each repository's own page, where they are sourced, or from the operator where linked. "Early 2030s" is drawn as 2030 to 2033.

Every repository on record

Facility Takes OperatorCountry Capacity Status
Wolsong LILW Disposal Center, Gyeongju Low and intermediate level Korea Radioactive Waste Agency South Korea 800,000drums operating
Konrad Low and intermediate level Bundesgesellschaft für Endlagerung Germany 303,000m³ construction
Yucca Mountain Spent fuel US Department of Energy United States 70,000tHM total closed
Asse II Low and intermediate level Bundesgesellschaft für Endlagerung Germany 47,000m³ closed
Morsleben (ERAM) Low and intermediate level Bundesgesellschaft für Endlagerung Germany 37,000m³ closed
Bátaapáti National Radioactive Waste Repository Low and intermediate level Public Limited Company for Radioactive Waste Management Hungary not disclosed operating
Beishan underground research laboratory High level China National Nuclear Corporation China not disclosed construction
Canadian deep geological repository Spent fuel Nuclear Waste Management Organization Canada not disclosed planned
Centre de l'Aube (CSA) Low and intermediate level Andra France not disclosed operating
Cigéo High level Andra France not disclosed planned
El Cabril Low and intermediate level ENRESA Spain not disclosed operating
Forsmark spent fuel repository (KBS-3) Spent fuel Svensk Kärnbränslehantering (SKB) Sweden not disclosed construction
Loviisa VLJ repository Low and intermediate level Fortum Finland not disclosed operating
Low Level Waste Repository, Drigg Low and intermediate level Nuclear Waste Services United Kingdom not disclosed operating
Nördlich Lägern Spent fuel Nagra Switzerland not disclosed planned
Olkiluoto VLJ repository Low and intermediate level Teollisuuden Voima Finland not disclosed operating
Onkalo Spent fuel Posiva Oy Finland not disclosed construction
Rokkasho LLW Disposal Center Low and intermediate level Japan Nuclear Fuel Limited Japan not disclosed operating
SFR, Forsmark Low and intermediate level Svensk Kärnbränslehantering (SKB) Sweden not disclosed operating
Waste Isolation Pilot Plant Transuranic US Department of Energy United States not disclosed operating
Yeniseisky underground research laboratory, Krasnoyarsk High level National Operator for Radioactive Waste Management Russia not disclosed construction