Skip to content

STEP

Planned tokamak United Kingdom

STEP is a tokamak fusion project run by UK Industrial Fusion Solutions / UKAEA in United Kingdom. It is planned. Like every fusion device built so far, it has produced no net electricity.

What it has actually demonstrated

No hardware. Site selected at West Burton, Nottinghamshire; £1.3 billion committed.

A spherical tokamak prototype intended to demonstrate net electricity, targeted for 2040. The spherical geometry is more compact than ITER's but leaves very little room for the central solenoid and the shielding a tritium-breeding blanket needs, the engineering trade at the heart of the design.

Project
OrganisationUK Industrial Fusion Solutions / UKAEA
Approachtokamak
Confinementmagnetic
CountryUnited Kingdom
StatusPlanned
First plasmanot yet
Targets
Target date2040
Power targetnone stated
Energy gain targetnone stated
Net electricityNo. no fusion device has produced any

Other tokamak projects

ProjectStatus
ARC Planned
BEST Under construction
DIII-D Operating
EAST Operating
HL-3 Operating
ITER Under construction
JET (Joint European Torus) Closed
JT-60SA Operating
K-DEMO Planned
KSTAR Operating
SPARC Under construction
ST40 Operating
WEST Operating

Fusion needs tritium, and the world's civilian stock comes mostly from CANDU fission reactors. See the fusion overview.

STEP in context

14 of the 24 fusion projects on record use the tokamak approach: 7 operating, 3 under construction, 3 planned and 1 closed.

It lists a target date of 2040, 14 years from now; of the 7 projects that list one, 6 list an earlier year. A target date is the project's own aim, not a forecast.

MeasureSTEPMedian of all projectsStanding
Target date204020287 of 7 (earliest first)

Worked out from the entries on this site only, so a figure compares STEP with what is recorded here, not with everything that exists. An entry with no value for a measure is left out of that measure's ranking and median.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try