SPARC

Under construction tokamak United States
Power target
100MW
target, not achieved

SPARC is a tokamak fusion device run by Commonwealth Fusion Systems in United States. It is under construction. Like every fusion device built so far, it has produced no net electricity.

What it has actually demonstrated

About 75% complete at Devens, Massachusetts, with the first toroidal field magnet installed in February 2026. First plasma targeted for 2027.

The most-watched private fusion project. Its bet is high-temperature superconducting magnets, which allow far stronger fields and therefore a much smaller machine than ITER for comparable performance. SPARC aims for a similar energy gain in roughly one-sixtieth the volume. If it reaches Q > 10 it will be the first device to demonstrate net plasma energy gain in a tokamak.

Project
OrganisationCommonwealth Fusion Systems
Approachtokamak
Confinementmagnetic
CountryUnited States
StatusUnder construction
First plasmanot yet
Targets
Target date2027
Power target100MW
Energy gain targetQ > 10
Net electricityNo. no fusion device has produced any

Other tokamak projects

ProjectStatus
ARC Planned
BEST Under construction
DIII-D Operating
EAST Operating
HL-3 Operating
ITER Under construction
JET (Joint European Torus) Closed
JT-60SA Operating
K-DEMO Planned
KSTAR Operating
ST40 Operating
STEP Planned
WEST Operating

Fusion needs tritium, and the world's civilian stock comes mostly from CANDU fission reactors. See the fusion overview.

SPARC in context

14 of the 24 fusion projects on record use the tokamak approach: 7 operating, 3 under construction, 3 planned and 1 closed.

It lists a target date of 2027, 1 year from now; of the 7 projects that list one, none lists an earlier year. A target date is the project's own aim, not a forecast.

Its stated fusion power target is 100 MW, 5th of the 6 projects that state one (median 300 MW).

MeasureSPARCMedian of all projectsStanding
Target date202720281 of 7 (earliest first)
Fusion power target (MW)1003005 of 6

Worked out from the entries on this site only, so a figure compares SPARC with what is recorded here, not with everything that exists. An entry with no value for a measure is left out of that measure's ranking and median.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.