ARC

Planned tokamak United States
Power target
400MW
target, not achieved

ARC is a tokamak fusion project run by Commonwealth Fusion Systems in United States. It is planned. Like every fusion device built so far, it has produced no net electricity.

What it has actually demonstrated

No hardware. Site selected in Chesterfield County, Virginia; the design follows SPARC.

Intended as the first fusion plant to sell electricity, at 400 MWe. Everything about it depends on SPARC working first.

Project
OrganisationCommonwealth Fusion Systems
Approachtokamak
Confinementmagnetic
CountryUnited States
StatusPlanned
First plasmanot yet
Targets
Target dateearly 2030s
Power target400MW
Energy gain targetnone stated
Net electricityNo. no fusion device has produced any

Other tokamak projects

ProjectStatus
BEST Under construction
DIII-D Operating
EAST Operating
HL-3 Operating
ITER Under construction
JET (Joint European Torus) Closed
JT-60SA Operating
K-DEMO Planned
KSTAR Operating
SPARC Under construction
ST40 Operating
STEP Planned
WEST Operating

Fusion needs tritium, and the world's civilian stock comes mostly from CANDU fission reactors. See the fusion overview.

ARC in context

14 of the 24 fusion projects on record use the tokamak approach: 7 operating, 3 under construction, 3 planned and 1 closed.

Its stated fusion power target is 400 MW, 2nd of the 6 projects that state one (median 300 MW).

MeasureARCMedian of all projectsStanding
Fusion power target (MW)4003002 of 6

Worked out from the entries on this site only, so a figure compares ARC with what is recorded here, not with everything that exists. An entry with no value for a measure is left out of that measure's ranking and median.