Planned tokamak South Korea

K-DEMO is a tokamak fusion project run by Korea Institute of Fusion Energy in South Korea. It is planned. Like every fusion device built so far, it has produced no net electricity.

What it has actually demonstrated

No hardware. Design phase.

Intended as the first plant to contribute fusion power to a grid, with an operational phase projected between 2037 and 2050.

Project
OrganisationKorea Institute of Fusion Energy
Approachtokamak
Confinementmagnetic
CountrySouth Korea
StatusPlanned
First plasmanot yet
Targets
Target date2037
Power targetnone stated
Energy gain targetnone stated
Net electricityNo. no fusion device has produced any

Other tokamak projects

ProjectStatus
ARC Planned
BEST Under construction
DIII-D Operating
EAST Operating
HL-3 Operating
ITER Under construction
JET (Joint European Torus) Closed
JT-60SA Operating
KSTAR Operating
SPARC Under construction
ST40 Operating
STEP Planned
WEST Operating

Fusion needs tritium, and the world's civilian stock comes mostly from CANDU fission reactors. See the fusion overview.

K-DEMO in context

14 of the 24 fusion projects on record use the tokamak approach: 7 operating, 3 under construction, 3 planned and 1 closed.

It lists a target date of 2037, 11 years from now; of the 7 projects that list one, 5 list an earlier year. A target date is the project's own aim, not a forecast.

MeasureK-DEMOMedian of all projectsStanding
Target date203720286 of 7 (earliest first)

Worked out from the entries on this site only, so a figure compares K-DEMO with what is recorded here, not with everything that exists. An entry with no value for a measure is left out of that measure's ranking and median.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.