Susquehanna nuclear power plant 2
Susquehanna nuclear power plant 2 is a boiling water reactor unit at Susquehanna nuclear power plant in United States rated at 1,330 MW gross. It is operating. Commercial operation began 12 Feb 1985.
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-4BWR-4 (Mark 2) in the source |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,330MW |
| Net capacity (reference) | 1,257MW |
| Net capacity (design) | 1,065MW |
| Thermal output | 3,952MWt |
| NSSS vendor | GE Vernova Hitachi Nuclear Energyall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | Susquehanna nuclear power plant |
|---|---|
| Unit | 2 |
| Country | United States |
| Owner | PPL CORP (former Pennsylvania Power & Light CO (PP&L))100% |
| Operator | PPL Susquehanna |
| Coordinates | 41.0919, -76.1462 |
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 2 Nov 1973Construction start
- 8 May 1984First criticality
- 3 Jul 1984Grid connection
- 12 Feb 1985Commercial operation
Other units at Susquehanna nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Susquehanna nuclear power plant 1 | 1,330 |
Other BWR-4 (Mark 2) units
5 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Limerick nuclear power plant 1 | United States | 1,194 | |
| Limerick nuclear power plant 2 | United States | 1,194 | |
| Susquehanna nuclear power plant 1 | United States | 1,330 | |
| Caorso nuclear power plant | Italy | Retired | 882 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2025-06-26
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data