Columbia nuclear power plant 1
Columbia nuclear power plant 1 is a boiling water reactor unit at Columbia nuclear power plant in United States rated at 1,190 MW gross. It is operating. Commercial operation began 13 Dec 1984.
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-5BWR-5 (Mark 2) in the source |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,190MW |
| Net capacity (reference) | 1,131MW |
| Net capacity (design) | 1,100MW |
| Thermal output | 3,486MWt |
| NSSS vendor | GE Vernova Hitachi Nuclear Energyall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | Columbia nuclear power plant |
|---|---|
| Unit | 1 |
| Country | United States |
| Owner | Energy Northwest100% |
| Operator | Energy Northwest |
| Coordinates | 46.4711, -119.3339 |
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Aug 1972Construction start
- 19 Jan 1984First criticality
- 27 May 1984Grid connection
- 13 Dec 1984Commercial operation
Other units at Columbia nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Columbia nuclear power plant EPU | Pre-construction | 162 |
Other BWR-5 (Mark 2) units
5 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| LaSalle nuclear power plant 1 | United States | 1,207 | |
| LaSalle nuclear power plant 2 | United States | 1,207 | |
| Nine Mile Point nuclear power plant 2 | United States | 1,320 | |
| Columbia nuclear power plant EPU | United States | Pre-construction | 162 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-27
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data