Sendai nuclear power plant 3 is a pressurised water reactor unit at Sendai nuclear power plant in Japan rated at 1,590 MW gross. It is shelved.

Specification
Reactor type Pressurised water reactor (PWR)
ModelMitsubishi advanced pressurized water reactor (APWR)
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,590MW
Net capacity (reference)not disclosed
Net capacity (design)1,590MW
Thermal output4,466MWt
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteSendai nuclear power plant
Unit3
CountryJapan
OwnerKyushu Electric Power Co Inc100%
OperatorKyushu Electric Power
Coordinates 31.8336, 130.1894
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Other units at Sendai nuclear power plant

UnitStatusGross MW
Sendai nuclear power plant 1 Operating 890
Sendai nuclear power plant 2 Operating 890

Other Mitsubishi advanced pressurized water reactor (APWR) units

3 units worldwide share this model designation.

UnitCountryStatusGross MW
Tsuruga nuclear power plant 3 Japan Shelved 1,538
Tsuruga nuclear power plant 4 Japan Shelved 1,538

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.