Skip to content

Tsuruga nuclear power plant 3

Shelved Japan
Gross capacity
1,538MW

Tsuruga nuclear power plant 3 is a pressurised water reactor unit at Tsuruga nuclear power plant in Japan rated at 1,538 MW gross. It is shelved.

Specification
Reactor type Pressurised water reactor (PWR)
ModelMitsubishi advanced pressurized water reactor (APWR)
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,538MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteTsuruga nuclear power plant
Unit3
CountryJapan
OwnerJapan Atomic Power Co100%
OperatorJapan Atomic Power
Coordinates 35.7506, 136.0197
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Other units at Tsuruga nuclear power plant

UnitStatusGross MW
Tsuruga nuclear power plant 1 Retired 357
Tsuruga nuclear power plant 2 Mothballed 1,160
Tsuruga nuclear power plant 4 Shelved 1,538

Other Mitsubishi advanced pressurized water reactor (APWR) units

3 units worldwide share this model designation.

UnitCountryStatusGross MW
Sendai nuclear power plant 3 Japan Shelved 1,590
Tsuruga nuclear power plant 4 Japan Shelved 1,538

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.