Sendai nuclear power plant 2 is a pressurised water reactor unit at Sendai nuclear power plant in Japan rated at 890 MW gross. It is operating. Commercial operation began 28 Nov 1985.

Specification
Reactor type Pressurised water reactor (PWR)
ModelM (3-loop)
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity890MW
Net capacity (reference)846MW
Net capacity (design)846MW
Thermal output2,660MWt
Typical enrichment3–5% U-235
Ownership & location
SiteSendai nuclear power plant
Unit2
CountryJapan
OwnerKyushu Electric Power Co Inc100%
OperatorKyushu Electric Power
Coordinates 31.8335, 130.1887
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 12 Oct 1981Construction start
  2. 18 Mar 1985First criticality
  3. 5 Apr 1985Grid connection
  4. 28 Nov 1985Commercial operation

Other units at Sendai nuclear power plant

UnitStatusGross MW
Sendai nuclear power plant 1 Operating 890
Sendai nuclear power plant 3 Shelved 1,590

Other M (3-loop) units

9 units worldwide share this model designation.

UnitCountryStatusGross MW
Ikata nuclear power plant 3 Japan Operating 890
Mihama nuclear power plant 3 Japan Operating 826
Sendai nuclear power plant 1 Japan Operating 890
Takahama nuclear power plant 1 Japan Operating 826
Takahama nuclear power plant 2 Japan Operating 826
Takahama nuclear power plant 3 Japan Operating 870
Takahama nuclear power plant 4 Japan Operating 870
Tomari nuclear power plant 3 Japan Under construction 912

Sources