Armenian nuclear power plant 2

Operating Armenia
Gross capacity
448MW

Armenian nuclear power plant 2 is a pressurised water reactor unit at Armenian nuclear power plant in Armenia rated at 448 MW gross. It is operating. Commercial operation began 3 May 1980.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-270
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity448MW
Net capacity (reference)416MW
Net capacity (design)375MW
Thermal output1,375MWt
NSSS vendorRosatomall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteArmenian nuclear power plant
Unit2
CountryArmenia
OwnerMinistry Of Territorial Administration And Infrastructure100%
OperatorClosed Joint Stock Company Armenian NPP
Coordinates 40.1817, 44.1423
Planned retirement2036planned, not actual
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jul 1975Construction start
  2. 1 Jan 1980First criticality
  3. 5 Jan 1980Grid connection
  4. 3 May 1980Commercial operation

Other units at Armenian nuclear power plant

UnitStatusGross MW
Armenian nuclear power plant 1 Retired 408
Armenian nuclear power plant 3 Announced 1,200

Other VVER V-270 units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Armenian nuclear power plant 1 Armenia Retired 408