Nuclear power in Armenia

Armenia operates 1 nuclear power reactor across 1 site, with 0.4 GW of gross capacity. 1 unit has been retired.

Operating
1
0.4 GW gross
Under construction
0
-
Planned
1
incl. 1 announced
Retired
1
0 cancelled
AZERBAIJANTURKEYARMENIAArmenian nuclear power plant: 2 units, 856 MWArmenian50 km
Operating1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.

Operating fleet by type: PWR (1). Principal operator: Closed Joint Stock Company Armenian NPP.

Operating capacity over time

First reactor online1977
Peak0.9 GW in 1980
Now0.4 GW 1 unit
2026 so farno change
00.20.40.60.8119801990200020102020GW
Gross capacity of units that had started up and not been permanently shut down by 31 December each year (2026 is to date). Amber marks the peak, green the present.
Data table
YearUnits onlineGW grossChange, GW
197710.41+0.41
198020.86+0.45
198910.45−0.41

Only years in which capacity changed are listed.

All units in Armenia

Fuel supply exposure

The fuel families Armenia's operating reactors take, and the fabricators our sources document as able to make each. This is capability, not contracts: it does not say who actually supplies a given plant.

Fuel familyUnitsGW grossDocumented fabricatorsNote
VVER (hexagonal) fuel10.4TVEL Fuel Company, Westinghouse Electric Company

See every country and who fabricates fuel.

Put this country on your own page: embed a card, or compare it with another country.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.