Skip to content

Armenian nuclear power plant 1

Retired Armenia
Gross capacity
408MW

Armenian nuclear power plant 1 is a pressurised water reactor unit at Armenian nuclear power plant in Armenia rated at 408 MW gross. It is retired. Commercial operation began 6 Oct 1977.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-270
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity408MW
Net capacity (reference)376MW
Net capacity (design)376MW
Thermal output1,375MWt
NSSS vendorRosatomall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteArmenian nuclear power plant
Unit1
CountryArmenia
OwnerMinistry Of Territorial Administration And Infrastructure100%
OperatorClosed Joint Stock Company Armenian NPP
Coordinates 40.1817, 44.1423
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jul 1969Construction start
  2. 15 Dec 1976First criticality
  3. 22 Dec 1976Grid connection
  4. 6 Oct 1977Commercial operation
  5. 25 Feb 1989Permanent shutdown

Other units at Armenian nuclear power plant

UnitStatusGross MW
Armenian nuclear power plant 2 Operating 448
Armenian nuclear power plant 3 Announced 1,200

Other VVER V-270 units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Armenian nuclear power plant 2 Armenia Operating 448

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.