Tianwan nuclear power plant
Tianwan nuclear power plant is a nuclear power station in China with 6 operating units totalling 6,608 MW gross. The site has 8 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-1 | PWR | VVER V-428 | 1,060 | 2007 | |
| Unit 1-2 | PWR | VVER V-428 | 1,060 | 2007 | |
| Unit 2-3 | PWR | VVER V-428M | 1,126 | 2018 | |
| Unit 2-4 | PWR | VVER V-428M | 1,126 | 2018 | |
| Unit 3-5 | PWR | CNP-1000 | 1,118 | 2020 | |
| Unit 3-6 | PWR | CNP-1000 | 1,118 | 2021 | |
| Unit 4-7 | Under construction | PWR | VVER-1200/V-491 | 1,265 | 2026 |
| Unit 4-8 | Under construction | PWR | VVER-1200/V-491 | 1,265 | 2027 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Tianwan nuclear power plant 1-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-428 |
| Size class | Large |
| Gross capacity | 1,060MW |
| Net capacity | 1,000MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 20 Oct 1999 |
|---|---|
| First criticality | 20 Dec 2005 |
| Grid connection | 12 May 2006 |
| Commercial operation | 17 May 2007 |
Tianwan nuclear power plant 1-2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-428 |
| Size class | Large |
| Gross capacity | 1,060MW |
| Net capacity | 1,000MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 20 Sep 2000 |
|---|---|
| First criticality | 1 May 2007 |
| Grid connection | 14 May 2007 |
| Commercial operation | 16 Aug 2007 |
Tianwan nuclear power plant 2-3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-428M |
| Size class | Large |
| Gross capacity | 1,126MW |
| Net capacity | 1,060MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 27 Dec 2012 |
|---|---|
| First criticality | 29 Sep 2017 |
| Grid connection | 30 Dec 2017 |
| Commercial operation | 14 Feb 2018 |
Tianwan nuclear power plant 2-4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-428M |
| Size class | Large |
| Gross capacity | 1,126MW |
| Net capacity | 1,060MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 27 Sep 2013 |
|---|---|
| First criticality | 30 Sep 2018 |
| Grid connection | 27 Oct 2018 |
| Commercial operation | 22 Dec 2018 |
Tianwan nuclear power plant 3-5
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,118MW |
| Net capacity | 1,060MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 27 Dec 2015 |
|---|---|
| First criticality | 27 Jul 2020 |
| Grid connection | 8 Aug 2020 |
| Commercial operation | 8 Sep 2020 |
Tianwan nuclear power plant 3-6
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,118MW |
| Net capacity | 1,060MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 7 Sep 2016 |
|---|---|
| First criticality | 4 May 2021 |
| Grid connection | 11 May 2021 |
| Commercial operation | 2 Jun 2021 |
Tianwan nuclear power plant 4-7 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200/V-491 |
| Size class | Large |
| Gross capacity | 1,265MW |
| Net capacity | 1,171MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 19 May 2021 |
|---|---|
| Commercial operation | 1 Jan 2026 |
Tianwan nuclear power plant 4-8 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200/V-491 |
| Size class | Large |
| Gross capacity | 1,265MW |
| Net capacity | 1,171MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Jiangsu Nuclear Power |
| Construction start | 25 Feb 2022 |
|---|---|
| Commercial operation | 1 Jan 2027 |
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| VVER (hexagonal) fuel | 6 | TVEL Fuel Company, Westinghouse Electric Company | Enriched |
| PWR (square-lattice) fuel | 2 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
China runs 4 operating units on VVER (hexagonal) fuel. 2 fabricators are documented for it. No documented fabricator is based in China.Country exposure
China runs 54 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. China National Nuclear Corporation is based in China.Country exposure
Tianwan nuclear power plant in context
By gross operating capacity Tianwan nuclear power plant is the 3rd largest of 18 operating nuclear sites in China, holding 10% of the country's operating capacity, and ranks 4th of 172 worldwide.
Its operating units started up between 2007 and 2021; the median unit is 8.0 years old, younger than the median of 10.0 in China.
The 6 units with both construction and grid dates on record took 4.6 to 6.6 years (median 5.0) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
The nearest other tracked nuclear sites are Haiyang nuclear power plant (284 km).
4 operating units are rated differently now from their design net capacities: Unit 1-1 +1.0%, Unit 1-2 +1.0%, Unit 3-5 +6.0% and Unit 3-6 +6.0%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1-1 | 1999 | 2006 | 6.6 | 6.8 (2000s) |
| Unit 1-2 | 2000 | 2007 | 6.6 | 6.8 (2000s) |
| Unit 2-3 | 2012 | 2017 | 5.0 | 5.9 (2010s) |
| Unit 2-4 | 2013 | 2018 | 5.1 | 5.9 (2010s) |
| Unit 3-5 | 2015 | 2020 | 4.6 | 7.7 (2020s) |
| Unit 3-6 | 2016 | 2021 | 4.7 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Haiyang nuclear power plant | China | 284 km | 2.5 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Tianwan nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Tianwan, Jiangsu, China |
|---|---|
| Coordinates | 34.6877, 119.4616 |
| Elevation | about 5 mabove sea level |
| Setting | On the sea coast, 0.1 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 6 Under construction: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | China National Nuclear Power Co Ltd |
|---|---|
| Operators | Jiangsu Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06