Skip to content

CNP-1000

The CNP-1000 is a Generation II pressurised water reactor from China National Nuclear Corporation. 6 units are operating and 0 are under construction, out of 6 on record.

Operating
6
6.6 GW gross
Under construction
0
Planned
0
Cancelled
0
0 retired

CNNC's three-loop 1000 MWe design, built at Fuqing and Tianwan. It was developed in parallel with, and in competition against, CGN's CPR-1000, and the two programmes were eventually merged by government direction into a single export product. That merger is Hualong One.

Design
VendorChina National Nuclear Corporation
Reactor typePressurised water reactor (PWR)
GenerationII
Capacity range1000–1120 MWe gross
CoolantLight water
Typical enrichment3–5% U-235
Where it is built
China 6 units, 6 operating

How long it took to build

Years from construction start to grid connection, for units with both dates on record. The median across 6 finished units is 5.2 years.

UnitCountryStartedConnectedYears
Fuqing nuclear power plant 1China 20082014 6.6
Fuqing nuclear power plant 2China 20092015 6.6
Fuqing nuclear power plant 3China 20102016 5.7
Fuqing nuclear power plant 4China 20122017 4.7
Tianwan nuclear power plant 3-5China 20152020 4.6
Tianwan nuclear power plant 3-6China 20162021 4.7

All CNP-1000 units

UnitCountryStatusGross MWOnline
Fuqing nuclear power plant 1 China Operating 1,089 2014
Fuqing nuclear power plant 2 China Operating 1,089 2015
Fuqing nuclear power plant 3 China Operating 1,089 2016
Fuqing nuclear power plant 4 China Operating 1,089 2017
Tianwan nuclear power plant 3-5 China Operating 1,118 2020
Tianwan nuclear power plant 3-6 China Operating 1,118 2021

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try