Oconee nuclear power plant
Oconee nuclear power plant is a nuclear power station in United States with 3 operating units totalling 2,682 MW gross. The site has 3 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | B&W LLP (DRYAMB) | 891 | 1973 | |
| Unit 2 | PWR | B&W LLP (DRYAMB) | 891 | 1974 | |
| Unit 3 | PWR | B&W LLP (DRYAMB) | 900 | 1974 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Oconee nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | B&W 177-FA |
| Size class | Large |
| Gross capacity | 891MW |
| Net capacity | 847MW |
| Thermal output | 2,568MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Babcock & Wilcox |
| Owner | Duke Energy Corp100% |
| Operator | Duke Energy |
| Construction start | 6 Nov 1967 |
|---|---|
| First criticality | 19 Apr 1973 |
| Grid connection | 6 May 1973 |
| Commercial operation | 15 Jul 1973 |
Live status, outage record and fuel chain for Oconee nuclear power plant 1
Oconee nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | B&W 177-FA |
| Size class | Large |
| Gross capacity | 891MW |
| Net capacity | 848MW |
| Thermal output | 2,568MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Babcock & Wilcox |
| Owner | Duke Energy Corp100% |
| Operator | Duke Energy |
| Construction start | 6 Nov 1967 |
|---|---|
| First criticality | 11 Nov 1973 |
| Grid connection | 5 Dec 1973 |
| Commercial operation | 9 Sep 1974 |
Live status, outage record and fuel chain for Oconee nuclear power plant 2
Oconee nuclear power plant 3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | B&W 177-FA |
| Size class | Large |
| Gross capacity | 900MW |
| Net capacity | 859MW |
| Thermal output | 2,568MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Babcock & Wilcox |
| Owner | Duke Energy Corp100% |
| Operator | Duke Energy |
| Construction start | 6 Nov 1967 |
|---|---|
| First criticality | 5 Sep 1974 |
| Grid connection | 18 Sep 1974 |
| Commercial operation | 16 Dec 1974 |
Live status, outage record and fuel chain for Oconee nuclear power plant 3
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 3 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
United States runs 63 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. Westinghouse Electric Company is based in United States.Country exposure
Oconee nuclear power plant in context
By gross operating capacity Oconee nuclear power plant is the 6th largest of 54 operating nuclear sites in the United States, holding 3% of the country's operating capacity, and ranks 53rd of 172 worldwide.
Its operating units started up between 1973 and 1974; the median unit is 52.0 years old, older than the median of 45.0 in the United States.
The 3 units with both construction and grid dates on record took 5.5 to 6.9 years (median 6.1) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.
The nearest other tracked nuclear sites are Virgil C Summer nuclear power plant (155 km), Catawba nuclear power plant (169 km) and McGuire nuclear power plant (191 km).
3 operating units are rated differently now from their design net capacities: Unit 1 -4.5%, Unit 2 -4.4% and Unit 3 -3.2%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1967 | 1973 | 5.5 | 5.4 (1970s) |
| Unit 2 | 1967 | 1973 | 6.1 | 5.4 (1970s) |
| Unit 3 | 1967 | 1974 | 6.9 | 5.4 (1970s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Virgil C Summer nuclear power plant | United States | 155 km | 1.0 |
| Catawba nuclear power plant | United States | 169 km | 2.4 |
| McGuire nuclear power plant | United States | 191 km | 2.4 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Oconee nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | South Carolina, United States |
|---|---|
| Coordinates | 34.7939, -82.8986 |
| Elevation | about 250 mabove sea level |
| Setting | About 310 km from the sea |
| Region | Northern America |
| Units by status | Operating: 3 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Duke Energy Corp |
|---|---|
| Operators | Duke Energy |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data