McGuire nuclear power plant is a nuclear power station in United States with 2 operating units totalling 2,430 MW gross. The site has 2 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | WH 4LP (ICECND) | 1,215 | 1981 | |
| Unit 2 | PWR | WH 4LP (ICECND) | 1,215 | 1984 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
McGuire nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 4-loop |
| Size class | Large |
| Gross capacity | 1,215MW |
| Net capacity | 1,158MW |
| Thermal output | 3,411MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Duke Energy Corp100% |
| Operator | Duke Energy |
| Construction start | 1 Apr 1971 |
|---|---|
| First criticality | 8 Aug 1981 |
| Grid connection | 12 Sep 1981 |
| Commercial operation | 1 Dec 1981 |
Live status, outage record and fuel chain for McGuire nuclear power plant 1
McGuire nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 4-loop |
| Size class | Large |
| Gross capacity | 1,215MW |
| Net capacity | 1,158MW |
| Thermal output | 3,411MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Duke Energy Corp100% |
| Operator | Duke Energy |
| Construction start | 1 Apr 1971 |
|---|---|
| First criticality | 8 May 1983 |
| Grid connection | 23 May 1983 |
| Commercial operation | 1 Mar 1984 |
Live status, outage record and fuel chain for McGuire nuclear power plant 2
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 2 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
United States runs 63 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. Westinghouse Electric Company is based in United States.Country exposure
McGuire nuclear power plant in context
By gross operating capacity McGuire nuclear power plant is the 12th largest of 54 operating nuclear sites in the United States, holding 2% of the country's operating capacity, and ranks 62nd of 172 worldwide.
Its operating units started up between 1981 and 1984; the median unit is 43.5 years old, younger than the median of 45.0 in the United States.
The 2 units with both construction and grid dates on record took 10.5 to 12.1 years (median 11.3) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Catawba nuclear power plant (44 km), Virgil C Summer nuclear power plant (131 km) and H. B. Robinson nuclear power plant (135 km).
The USGS catalogue holds no earthquake of magnitude 5 or more within 100 km of the site between 1975 and 2025.
2 operating units are rated differently now from their design net capacities: Unit 1 -1.9% and Unit 2 -1.9%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1971 | 1981 | 10.5 | 7.3 (1980s) |
| Unit 2 | 1971 | 1983 | 12.1 | 7.3 (1980s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Catawba nuclear power plant | United States | 44 km | 2.4 |
| Virgil C Summer nuclear power plant | United States | 131 km | 1.0 |
| H. B. Robinson nuclear power plant | United States | 135 km | 0.8 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. Earthquake counts are from the USGS catalogue, as on the earthquake history page. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of McGuire nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | North Carolina, United States |
|---|---|
| Coordinates | 35.4331, -80.9486 |
| Elevation | about 245 mabove sea level |
| Setting | About 270 km from the sea |
| Region | Northern America |
| Units by status | Operating: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Duke Energy Corp |
|---|---|
| Operators | Duke Energy |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06