Belleville nuclear power plant
Belleville nuclear power plant is a nuclear power station in France with 2 operating units totalling 2,726 MW gross. The site has 2 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | P4 REP 1300 | 1,363 | 1988 | |
| Unit 2 | PWR | P4 REP 1300 | 1,363 | 1989 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Belleville nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | P4 1300 MWe series |
| Size class | Large |
| Gross capacity | 1,363MW |
| Net capacity | 1,310MW |
| Thermal output | 3,817MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 May 1980 |
|---|---|
| First criticality | 9 Sep 1987 |
| Grid connection | 14 Oct 1987 |
| Commercial operation | 1 Jun 1988 |
Live status, outage record and fuel chain for Belleville nuclear power plant 1
Belleville nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | P4 1300 MWe series |
| Size class | Large |
| Gross capacity | 1,363MW |
| Net capacity | 1,310MW |
| Thermal output | 3,817MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Aug 1980 |
|---|---|
| First criticality | 25 May 1988 |
| Grid connection | 6 Jul 1988 |
| Commercial operation | 1 Jan 1989 |
Live status, outage record and fuel chain for Belleville nuclear power plant 2
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 2 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
France runs 57 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. Framatome is based in France.Country exposure
Outage record
One cell per day for the last 90 days, from hourly checks of the grid operator's feed. Red is a day mostly offline, amber a day with some offline or reduced hours, grey a day with no checks. For units whose feed only declares outages, a green day means no outage was declared, not that the unit was confirmed running.
Belleville nuclear power plant in context
By gross operating capacity Belleville nuclear power plant is the 15th largest of 18 operating nuclear sites in France, holding 4% of the country's operating capacity, and ranks 49th of 172 worldwide.
Its operating units started up between 1988 and 1989; the median unit is 37.5 years old, younger than the median of 41.0 in France.
The 2 units with both construction and grid dates on record took 7.5 to 7.9 years (median 7.7) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Dampierre nuclear power plant (36 km), Saint-Laurent nuclear power plant (100 km) and Nogent nuclear power plant (122 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1980 | 1987 | 7.5 | 7.3 (1980s) |
| Unit 2 | 1980 | 1988 | 7.9 | 7.3 (1980s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Dampierre nuclear power plant | France | 36 km | 3.7 |
| Saint-Laurent nuclear power plant | France | 100 km | 1.9 |
| Nogent nuclear power plant | France | 122 km | 2.7 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Belleville nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Centre-Val de Loire, France |
|---|---|
| Coordinates | 47.5103, 2.8750 |
| Elevation | about 145 mabove sea level |
| Setting | About 280 km from the sea |
| Region | Western Europe |
| Units by status | Operating: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Electricité de France SA |
|---|---|
| Operators | Electricité de France |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data