Chinon nuclear power plant
Chinon nuclear power plant is a nuclear power station in France with 4 operating units totalling 3,816 MW gross. The site has 7 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit B-1 | PWR | CP2 | 954 | 1984 | |
| Unit B-2 | PWR | CP2 | 954 | 1984 | |
| Unit B-3 | PWR | CP2 | 954 | 1987 | |
| Unit B-4 | PWR | CP2 | 954 | 1988 | |
| Unit A-1 | Retired | GCR | Uranium Naturel Graphite Gaz | 80 | 1964 |
| Unit A-2 | Retired | GCR | Uranium Naturel Graphite Gaz | 230 | 1965 |
| Unit A-3 | Retired | GCR | Uranium Naturel Graphite Gaz | 480 | 1966 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Chinon nuclear power plant B-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CP2 |
| Size class | Large |
| Gross capacity | 954MW |
| Net capacity | 905MW |
| Thermal output | 2,785MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Mar 1977 |
|---|---|
| First criticality | 28 Oct 1982 |
| Grid connection | 30 Nov 1982 |
| Commercial operation | 1 Feb 1984 |
Live status, outage record and fuel chain for Chinon nuclear power plant B-1
Chinon nuclear power plant B-2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CP2 |
| Size class | Large |
| Gross capacity | 954MW |
| Net capacity | 905MW |
| Thermal output | 2,785MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Mar 1977 |
|---|---|
| First criticality | 23 Sep 1983 |
| Grid connection | 29 Nov 1983 |
| Commercial operation | 1 Aug 1984 |
Live status, outage record and fuel chain for Chinon nuclear power plant B-2
Chinon nuclear power plant B-3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CP2 |
| Size class | Large |
| Gross capacity | 954MW |
| Net capacity | 905MW |
| Thermal output | 2,785MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Oct 1980 |
|---|---|
| First criticality | 18 Sep 1986 |
| Grid connection | 20 Oct 1986 |
| Commercial operation | 4 Mar 1987 |
Live status, outage record and fuel chain for Chinon nuclear power plant B-3
Chinon nuclear power plant B-4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CP2 |
| Size class | Large |
| Gross capacity | 954MW |
| Net capacity | 905MW |
| Thermal output | 2,785MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Feb 1981 |
|---|---|
| First criticality | 13 Oct 1987 |
| Grid connection | 14 Nov 1987 |
| Commercial operation | 1 Apr 1988 |
Live status, outage record and fuel chain for Chinon nuclear power plant B-4
Chinon nuclear power plant A-1 Retired
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | Uranium Naturel Graphite Gaz |
| Size class | Small |
| Gross capacity | 80MW |
| Net capacity | 70MW |
| Thermal output | 300MWt |
| Enrichment | Natural uranium to 2.5–3.5% U-235no enrichment required |
| NSSS vendor | not on record |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Feb 1957 |
|---|---|
| First criticality | 16 Sep 1962 |
| Grid connection | 14 Jun 1963 |
| Commercial operation | 1 Feb 1964 |
| Permanent shutdown | 16 Apr 1973 |
Chinon nuclear power plant A-2 Retired
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | Uranium Naturel Graphite Gaz |
| Size class | Small |
| Gross capacity | 230MW |
| Net capacity | 180MW |
| Thermal output | 800MWt |
| Enrichment | Natural uranium to 2.5–3.5% U-235no enrichment required |
| NSSS vendor | not on record |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Aug 1959 |
|---|---|
| First criticality | 17 Aug 1964 |
| Grid connection | 24 Feb 1965 |
| Commercial operation | 24 Feb 1965 |
| Permanent shutdown | 14 Jun 1985 |
Chinon nuclear power plant A-3 Retired
| Reactor type | Gas-cooled reactor (GCR) |
|---|---|
| Model | Uranium Naturel Graphite Gaz |
| Size class | Large |
| Gross capacity | 480MW |
| Net capacity | 360MW |
| Thermal output | 1,170MWt |
| Enrichment | Natural uranium to 2.5–3.5% U-235no enrichment required |
| NSSS vendor | not on record |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Mar 1961 |
|---|---|
| First criticality | 1 Mar 1966 |
| Grid connection | 4 Aug 1966 |
| Commercial operation | 4 Aug 1966 |
| Permanent shutdown | 15 Jun 1990 |
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| PWR (square-lattice) fuel | 4 | China National Nuclear Corporation, ENUSA Industrias Avanzadas, Framatome, KEPCO Nuclear Fuel, Mitsubishi Heavy Industries, Westinghouse Electric Company | Enriched |
France runs 57 operating units on PWR (square-lattice) fuel. 6 fabricators are documented for it. Framatome is based in France.Country exposure
Outage record
One cell per day for the last 90 days, from hourly checks of the grid operator's feed. Red is a day mostly offline, amber a day with some offline or reduced hours, grey a day with no checks. For units whose feed only declares outages, a green day means no outage was declared, not that the unit was confirmed running.
Chinon nuclear power plant in context
By gross operating capacity Chinon nuclear power plant is the 7th largest of 18 operating nuclear sites in France, holding 6% of the country's operating capacity, and ranks 26th of 172 worldwide.
Its operating units started up between 1984 and 1988; the median unit is 40.5 years old, younger than the median of 41.0 in France.
The 7 units with both construction and grid dates on record took 5.4 to 6.8 years (median 6.1) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Civaux nuclear power plant (93 km), Saint-Laurent nuclear power plant (120 km) and Dampierre nuclear power plant (186 km).
The USGS catalogue holds no earthquake of magnitude 5 or more within 100 km of the site between 1975 and 2025.
2 operating units are rated differently now from their design net capacities: Unit B-1 +4.0% and Unit B-2 +4.0%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit A-1 | 1957 | 1963 | 6.4 | 5.0 (1960s) |
| Unit A-2 | 1959 | 1965 | 5.6 | 5.0 (1960s) |
| Unit A-3 | 1961 | 1966 | 5.4 | 5.0 (1960s) |
| Unit B-1 | 1977 | 1982 | 5.7 | 7.3 (1980s) |
| Unit B-2 | 1977 | 1983 | 6.7 | 7.3 (1980s) |
| Unit B-3 | 1980 | 1986 | 6.1 | 7.3 (1980s) |
| Unit B-4 | 1981 | 1987 | 6.8 | 7.3 (1980s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Civaux nuclear power plant | France | 93 km | 3.1 |
| Saint-Laurent nuclear power plant | France | 120 km | 1.9 |
| Dampierre nuclear power plant | France | 186 km | 3.7 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. Earthquake counts are from the USGS catalogue, as on the earthquake history page. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Chinon nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Centre-Val de Loire, France |
|---|---|
| Coordinates | 47.2254, 0.1656 |
| Elevation | about 50 mabove sea level |
| Setting | About 140 km from the sea |
| Region | Western Europe |
| Units by status | Operating: 4 Retired: 3 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Electricité de France SA |
|---|---|
| Operators | Electricité de France |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data