Skip to content

McArthur River / Key Lake

mining Canada operating
Output 2024
7,808tU/yr

McArthur River / Key Lake is a mining facility operated by Cameco Corporation in Canada. It produced 7,808 tU/yr in 2024.

The highest-grade uranium mine in the world, with ore averaging over 6% U, roughly a hundred times the global average grade. The ore is so radioactive that it is mined remotely by raise-boring and non-entry methods, then trucked 80 km to the Key Lake mill for processing.

Facility
StageMining and milling
OperatorCameco Corporation
CountryCanada
Reported output 7,808tU/yr
Figure applies to2024
Statusoperating
Commissionednot stated
Coordinates57.7667, -105.0333
Position in the chain

No disclosed capacity, so its share of world mining capacity cannot be stated.

Cameco Corporation also operates:

Other mining facilities

FacilityCapacityStatus
Cigar Lake 6,501tU/yr operating
Husab 4,437tU/yr operating
Karatau (Budenovskoye 2) 3,299tU/yr operating
Inkai, sites 1-3 2,992tU/yr operating
Akdala and South Inkai 2,803tU/yr operating
Olympic Dam 2,693tU/yr operating
Moinkum and Tortkuduk (KATCO) 2,388tU/yr operating
Rössing 2,205tU/yr operating
Smith Ranch-Highland 2,116tU/yr operating
Khorassan 1 2,030tU/yr operating
White Mesa Mill 2,000short tons ore/day operating
Central Mynkuduk 1,650tU/yr operating
Budenovskoye 1, 3 & 4 (Akbastau) 1,545tU/yr operating
Four Mile 1,503tU/yr operating
Kharasan 2 (Baiken-U) 1,315tU/yr operating
South Moinkum and Kanzhugan 1,273tU/yr operating
Ross Central Processing Plant 1,154tU/yr operating
Khiagda 1,103tU/yr operating
Priargunsky 1,047tU/yr operating
Somaïr (Arlit) 960tU/yr operating
Honeymoon 942tU/yr operating
Irkol 940tU/yr operating
Yining 850tU/yr operating
Western Mynkuduk (Appak) 830tU/yr operating
North and South Karamurun 830tU/yr operating
Lost Creek 769tU/yr operating
Zarechnoye 741tU/yr operating
Langer Heinrich 691tU/yr operating
Dalur 588tU/yr operating
Alta Mesa 577tU/yr operating
Willow Creek 500tU/yr operating
Fuzhou 350tU/yr operating
Caetité (Lagoa Real) 340tU/yr operating
Tummalapalle 220tU/yr operating
Shaoguan 200tU/yr operating
Tongliao 200tU/yr operating
Jaduguda mine and mill 200tU/yr operating
Turamdih mine and mill 190tU/yr operating
Northern Mining Directorate (Uchkuduk) not disclosed operating
Central Mining Directorate (Zarafshan) not disclosed operating
Mining Directorate No. 5 (Zafarabad) not disclosed operating
Southern Mining Directorate (Nurabad) not disclosed operating
Ingulska not disclosed operating
Smolinska not disclosed operating
Novokostiantynivska not disclosed operating
Moab Khotsong not disclosed operating

At the market indicator. 7,808 tU produced in 2024, valued at US$ 89.68 per lb U₃O₈ spot, comes to roughly US$ 1.82 billion a year, or US$ 1.96 billion at the long-term indicator. Treat both as scale, not revenue: most volume moves under contracts signed years earlier at prices neither figure reflects, and nothing here is netted against the cost of producing it. The indicators, and forty years of history behind them, are on fuel market prices.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.