Skip to content
nuclearchain

Penly nuclear power plant 3

Pre-construction France
Gross capacity
1,650MW

Penly nuclear power plant 3 is a pressurised water reactor unit at Penly nuclear power plant in France rated at 1,650 MW gross. It is pre-construction. Commercial operation began 1 Jan 2038.

Specification
Reactor type Pressurised water reactor (PWR)
ModelEPR2
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,650MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichment3–5% U-235
Ownership & location
SitePenly nuclear power plant
Unit3
CountryFrance
OwnerElectricité de France SA100%
OperatorElectricité de France
Coordinates 49.9764, 1.2107
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 2027Construction start
  2. 1 Jan 2038Commercial operation

Other units at Penly nuclear power plant

UnitStatusGross MW
Penly nuclear power plant 1 Operating 1,382
Penly nuclear power plant 2 Operating 1,382
Penly nuclear power plant 4 Pre-construction 1,650

Other EPR2 units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Bugey nuclear power plant 6 France Announced 1,650
Bugey nuclear power plant 7 France Announced 1,650
Gravelines nuclear power plant 7 France Announced 1,650
Gravelines nuclear power plant 8 France Announced 1,650
Penly nuclear power plant 4 France Pre-construction 1,650

Sources