Novovoronezh nuclear power plant 2-2

Operating Russia
Gross capacity
1,181MW

Novovoronezh nuclear power plant 2-2 is a pressurised water reactor unit at Novovoronezh nuclear power plant in Russia rated at 1,181 MW gross. It is operating. Commercial operation began 31 Oct 2019.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-392M
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,181MW
Net capacity (reference)1,101MW
Net capacity (design)1,114MW
Thermal output3,200MWt
Typical enrichment3–5% U-235
Ownership & location
SiteNovovoronezh nuclear power plant
Unit2-2
CountryRussia
OwnerRosatom100%
OperatorRosenergoatom
Coordinates 51.2668, 39.2151
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 12 Jul 2009Construction start
  2. 22 Mar 2019First criticality
  3. 1 May 2019Grid connection
  4. 31 Oct 2019Commercial operation

Other units at Novovoronezh nuclear power plant

Other VVER V-392M units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Novovoronezh nuclear power plant 2-1 Russia Operating 1,180