Novovoronezh nuclear power plant
Novovoronezh nuclear power plant is a nuclear power station in Russia with 4 operating units totalling 3,778 MW gross. The site has 9 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-4 | PWR | VVER V-179 | 417 | 1973 | |
| Unit 1-5 | PWR | VVER V-187 | 1,000 | 1981 | |
| Unit 2-1 | PWR | VVER V-392M | 1,180 | 2017 | |
| Unit 2-2 | PWR | VVER V-392M | 1,181 | 2019 | |
| Unit 1-1 | Retired | PWR | VVER V-210 | 210 | 1964 |
| Unit 1-2 | Retired | PWR | VVER V-365 | 365 | 1970 |
| Unit 1-3 | Retired | PWR | VVER V-179 | 417 | 1972 |
| Unit 2-3 | Announced | PWR | VVER-1200 | 1,200 | 2032 |
| Unit 2-4 | Announced | PWR | VVER-1200 | 1,200 | 2036 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Novovoronezh nuclear power plant 1-4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-179 |
| Size class | Large |
| Gross capacity | 417MW |
| Net capacity | 385MW |
| Thermal output | 1,375MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Planned retirement | 2032planned, not actual |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jul 1967 |
|---|---|
| First criticality | 25 Dec 1972 |
| Grid connection | 28 Dec 1972 |
| Commercial operation | 24 Mar 1973 |
Novovoronezh nuclear power plant 1-5
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-187 |
| Size class | Large |
| Gross capacity | 1,000MW |
| Net capacity | 950MW |
| Thermal output | 3,000MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Planned retirement | 2040planned, not actual |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Mar 1974 |
|---|---|
| First criticality | 30 Apr 1980 |
| Grid connection | 31 May 1980 |
| Commercial operation | 20 Feb 1981 |
Novovoronezh nuclear power plant 2-1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-392M |
| Size class | Large |
| Gross capacity | 1,180MW |
| Net capacity | 1,100MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 24 Jun 2008 |
|---|---|
| First criticality | 20 May 2016 |
| Grid connection | 5 Aug 2016 |
| Commercial operation | 27 Feb 2017 |
Novovoronezh nuclear power plant 2-2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-392M |
| Size class | Large |
| Gross capacity | 1,181MW |
| Net capacity | 1,101MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 12 Jul 2009 |
|---|---|
| First criticality | 22 Mar 2019 |
| Grid connection | 1 May 2019 |
| Commercial operation | 31 Oct 2019 |
Novovoronezh nuclear power plant 1-1 Retired
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-210 |
| Size class | Small |
| Gross capacity | 210MW |
| Net capacity | 197MW |
| Thermal output | 760MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Ministry Of Medium Machine Building Of The USSR (Minsredmash)100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jul 1957 |
|---|---|
| First criticality | 17 Dec 1963 |
| Grid connection | 30 Sep 1964 |
| Commercial operation | 31 Dec 1964 |
| Permanent shutdown | 16 Feb 1988 |
Novovoronezh nuclear power plant 1-2 Retired
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-365 |
| Size class | Large |
| Gross capacity | 365MW |
| Net capacity | 336MW |
| Thermal output | 1,320MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Ministry Of Medium Machine Building Of The USSR (Minsredmash)100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jun 1964 |
|---|---|
| First criticality | 23 Dec 1969 |
| Grid connection | 27 Dec 1969 |
| Commercial operation | 14 Apr 1970 |
| Permanent shutdown | 29 Aug 1990 |
Novovoronezh nuclear power plant 1-3 Retired
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER V-179 |
| Size class | Large |
| Gross capacity | 417MW |
| Net capacity | 385MW |
| Thermal output | 1,375MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Construction start | 1 Jul 1967 |
|---|---|
| First criticality | 22 Dec 1971 |
| Grid connection | 27 Dec 1971 |
| Commercial operation | 29 Jun 1972 |
| Permanent shutdown | 25 Dec 2016 |
Novovoronezh nuclear power plant 2-3 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200 |
| Size class | Large |
| Gross capacity | 1,200MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Commercial operation | 1 Jan 2032 |
|---|
Novovoronezh nuclear power plant 2-4 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200 |
| Size class | Large |
| Gross capacity | 1,200MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | Rosatom100% |
| Operator | Rosenergoatom |
| Commercial operation | 1 Jan 2036 |
|---|
Fuel supply
Which fabricators are documented as able to make the fuel this plant's units take. This is capability from our supplier table, not a statement of who the operator buys from: utilities do not publish fuel contracts.
| Fuel | Units here | Documented fabricators | Enrichment |
|---|---|---|---|
| VVER (hexagonal) fuel | 4 | TVEL Fuel Company, Westinghouse Electric Company | Enriched |
Russia runs 23 operating units on VVER (hexagonal) fuel. 2 fabricators are documented for it. TVEL Fuel Company is based in Russia.Country exposure
Novovoronezh nuclear power plant in context
By gross operating capacity Novovoronezh nuclear power plant is the 5th largest of 10 operating nuclear sites in Russia, holding 13% of the country's operating capacity, and ranks 28th of 172 worldwide.
Its operating units started up between 1973 and 2019; the median unit is 27.0 years old, younger than the median of 37.5 in Russia.
The 7 units with both construction and grid dates on record took 4.5 to 9.8 years (median 6.3) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.
The nearest other tracked nuclear sites are Kursk nuclear power plant (254 km).
The USGS catalogue holds no earthquake of magnitude 5 or more within 100 km of the site between 1975 and 2025.
2 operating units are rated differently now from their design net capacities: Unit 2-1 -1.3% and Unit 2-2 -1.2%.
The tracker lists a planned retirement year, a forecast and not a decision on record, for 2 operating units: Unit 1-4 (2032) and Unit 1-5 (2040).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1-1 | 1957 | 1964 | 7.2 | 5.0 (1960s) |
| Unit 1-2 | 1964 | 1969 | 5.6 | 5.0 (1960s) |
| Unit 1-3 | 1967 | 1971 | 4.5 | 5.4 (1970s) |
| Unit 1-4 | 1967 | 1972 | 5.5 | 5.4 (1970s) |
| Unit 1-5 | 1974 | 1980 | 6.3 | 7.3 (1980s) |
| Unit 2-1 | 2008 | 2016 | 8.1 | 5.9 (2010s) |
| Unit 2-2 | 2009 | 2019 | 9.8 | 5.9 (2010s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Kursk nuclear power plant | Russia | 254 km | 3.3 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. Earthquake counts are from the USGS catalogue, as on the earthquake history page. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Novovoronezh nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Voronezh, Russia |
|---|---|
| Coordinates | 51.2668, 39.2151 |
| Elevation | about 140 mabove sea level |
| Setting | About 440 km from the sea |
| Region | Eastern Europe |
| Units by status | Operating: 4 Retired: 3 Announced: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Ministry Of Medium Machine Building Of The USSR (Minsredmash) Rosatom |
|---|---|
| Operators | Rosenergoatom |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data