Kuosheng nuclear power plant 1
Kuosheng nuclear power plant 1 is a boiling water reactor unit at Kuosheng nuclear power plant in Taiwan rated at 985 MW gross. It is retired. Commercial operation began 28 Dec 1981.
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-6 |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 985MW |
| Net capacity (reference) | 985MW |
| Net capacity (design) | 948MW |
| Thermal output | 2,894MWt |
| NSSS vendor | GE Vernova Hitachi Nuclear Energyall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | Kuosheng nuclear power plant |
|---|---|
| Unit | 1 |
| Country | Taiwan |
| Owner | Taiwan Power Co100% |
| Operator | Taiwan Power |
| Coordinates | 25.2025, 121.6629 |
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 19 Nov 1975Construction start
- 1 Feb 1981First criticality
- 21 May 1981Grid connection
- 28 Dec 1981Commercial operation
- 28 Dec 2021Permanent shutdown
Other units at Kuosheng nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Kuosheng nuclear power plant 2 | Retired | 985 |
Other BWR-6 units
5 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Leibstadt nuclear power plant | Switzerland | 1,275 | |
| Kuosheng nuclear power plant 2 | Taiwan | Retired | 985 |
| Montalto di Castro nuclear power plant 1 | Italy | Cancelled | 1,009 |
| Montalto di Castro nuclear power plant 2 | Italy | Cancelled | 1,009 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-07
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data