Indian Point nuclear power plant 2
Retired United States
Gross capacity
1,067MW
Indian Point nuclear power plant 2 is a pressurised water reactor unit at Indian Point nuclear power plant in United States rated at 1,067 MW gross. It is retired. Commercial operation began 1 Aug 1974.
Specification
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | WH 4LP (DRYAMB) |
| Size class | Large |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,067MW |
| Net capacity (reference) | 998MW |
| Net capacity (design) | 873MW |
| Thermal output | 3,216MWt |
| Typical enrichment | 3–5% U-235 |
Ownership & location
| Site | Indian Point nuclear power plant |
|---|---|
| Unit | 2 |
| Country | United States |
| Owner | Entergy Nuclear Operations Inc100% |
| Operator | Entergy Nuclear Operations |
| Coordinates | 41.2706, -73.9527 |
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
- China National Nuclear Corporation PWR fuel assemblies
- ENUSA Industrias Avanzadas PWR and BWR fuel assemblies
- Framatome PWR fuel assemblies
- KEPCO Nuclear Fuel PWR fuel assemblies
- Mitsubishi Heavy Industries PWR fuel assemblies
- Westinghouse Electric Company PWR fuel assemblies
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 14 Oct 1966Construction start
- 22 May 1973First criticality
- 26 Jun 1973Grid connection
- 1 Aug 1974Commercial operation
- 30 Apr 2020Permanent shutdown
Other units at Indian Point nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Indian Point nuclear power plant 1 | Retired | 277 |
| Indian Point nuclear power plant 3 | Retired | 1,085 |
Other WH 4LP (DRYAMB) units
19 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Alvin W Vogtle nuclear power plant 1 | United States | 1,229 | |
| Alvin W Vogtle nuclear power plant 2 | United States | 1,229 | |
| Braidwood nuclear power plant 1 | United States | 1,270 | |
| Braidwood nuclear power plant 2 | United States | 1,230 | |
| Byron nuclear power plant 1 | United States | 1,242 | |
| Byron nuclear power plant 2 | United States | 1,210 | |
| Callaway nuclear power plant 1 | United States | 1,275 | |
| Comanche Peak nuclear power plant 1 | United States | 1,259 | |
| Comanche Peak nuclear power plant 2 | United States | 1,250 | |
| Diablo Canyon nuclear power plant 1 | United States | 1,197 | |
| Diablo Canyon nuclear power plant 2 | United States | 1,197 | |
| Salem nuclear power plant 1 | United States | 1,254 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-28
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted