Hinkley Point nuclear power plant C2

Under construction United Kingdom
Gross capacity
1,720MW

Hinkley Point nuclear power plant C2 is a pressurised water reactor unit at Hinkley Point nuclear power plant in United Kingdom rated at 1,720 MW gross. It is under construction. Commercial operation began 1 Jan 2031.

Specification
Reactor type Pressurised water reactor (PWR)
ModelEPREPR-1750 in the source
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,720MW
Net capacity (reference)1,630MW
Net capacity (design)1,630MW
Thermal output4,524MWt
NSSS vendorFramatomeall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteHinkley Point nuclear power plant
UnitC2
CountryUnited Kingdom
OwnerChina General Nuclear100%
EDF Energy
OperatorEDF Energy
China General Nuclear
Coordinates 51.2063, -3.1423
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 12 Dec 2019Construction start
  2. 1 Jan 2031Commercial operation

Other units at Hinkley Point nuclear power plant

Other EPR-1750 units

4 units worldwide share this model designation.

UnitCountryStatusGross MW
Taishan nuclear power plant 1-1 China Operating 1,750
Taishan nuclear power plant 1-2 China Operating 1,750
Hinkley Point nuclear power plant C1 United Kingdom Under construction 1,720

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.