Chashma nuclear power plant 5

Under construction Pakistan
Gross capacity
1,200MW

Chashma nuclear power plant 5 is a pressurised water reactor unit at Chashma nuclear power plant in Pakistan rated at 1,200 MW gross. It is under construction. Commercial operation began 1 Jan 2030.

Specification
Reactor type Pressurised water reactor (PWR)
ModelHualong One
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,200MW
Net capacity (reference)1,117MW
Net capacity (design)1,117MW
Thermal output3,180MWt
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteChashma nuclear power plant
Unit5
CountryPakistan
Coordinates 32.3920, 71.4616
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 30 Dec 2024Construction start
  2. 1 Jan 2030Commercial operation

Other units at Chashma nuclear power plant

UnitStatusGross MW
Chashma nuclear power plant 1 Operating 325
Chashma nuclear power plant 2 Operating 325
Chashma nuclear power plant 3 Operating 340
Chashma nuclear power plant 4 Operating 340

Other Hualong One units

4 units worldwide share this model designation.

UnitCountryStatusGross MW
Atucha nuclear power plant 3 Argentina Shelved 1,150
Bradwell B nuclear power plant 1 United Kingdom Cancelled 1,150
Bradwell B nuclear power plant 2 United Kingdom Cancelled 1,150

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.