Skip to content

Bailong nuclear power plant 1-1

Under construction China
Gross capacity
1,254MW

Bailong nuclear power plant 1-1 is a pressurised water reactor unit at Bailong nuclear power plant in China rated at 1,254 MW gross. It is under construction. Commercial operation began 1 Jan 2030.

Specification
Reactor type Pressurised water reactor (PWR)
ModelCAP1000
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,254MW
Net capacity (reference)1,160MW
Net capacity (design)1,160MW
Thermal output3,400MWt
NSSS vendorState Power Investment Corporationall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteBailong nuclear power plant
Unit1-1
CountryChina
OwnerState Nuclear Power Technology Co Ltd100%
OperatorCPI Guangxi Nuclear Power
Coordinates 21.5065, 108.2242
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 25 Dec 2025Construction start
  2. 1 Jan 2030Commercial operation

Other units at Bailong nuclear power plant

UnitStatusGross MW
Bailong nuclear power plant 1-2 Pre-construction 1,250
Bailong nuclear power plant 3 Announced 1,400
Bailong nuclear power plant 4 Announced 1,400
Bailong nuclear power plant 5 Announced 1,400
Bailong nuclear power plant 6 Announced 1,400

Other CAP1000 units

38 units worldwide share this model designation.

UnitCountryStatusGross MW
Bailong nuclear power plant 1-2 China Pre-construction 1,250
Guangshui nuclear power plant 1 China Cancelled 1,250
Guangshui nuclear power plant 2 China Cancelled 1,250
Guangshui nuclear power plant 3 China Cancelled 1,250
Guangshui nuclear power plant 4 China Cancelled 1,250
Haifeng nuclear power plant 1 China Cancelled 1,250
Haifeng nuclear power plant 2 China Cancelled 1,250
Haiyang nuclear power plant 2-3 China Under construction 1,253
Haiyang nuclear power plant 2-4 China Under construction 1,253
Haiyang nuclear power plant 3-5 China Pre-construction 1,250
Haiyang nuclear power plant 3-6 China Pre-construction 1,250
Hengren nuclear power plant 1 China Cancelled 1,250

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.