State Power Investment Corporation

State Power Investment Corporation is the nuclear steam supply system vendor for 48 reactor units on record, 1 of them operating, totalling 1.5 GW of gross capacity across 1 country.

Operating units
1
1.5 GW gross
Under construction
10
Planned
15
Retired
0

Holder of the Chinese rights to the Westinghouse AP1000, which it localised as the CAP1000 and scaled up into the indigenous CAP1400 (Guohe One). Operates through its subsidiary State Nuclear Power Technology Corporation.

Company
HeadquartersBeijing, China
Founded2015
Ownershipstate
Roles in the chainvendor, operator
Installed base by country
China1

State Power Investment Corporation in context

State Power Investment Corporation is the reactor vendor for 1 of the 419 operating units on record (under 1%), 13th of 13 vendors by operating units, 1,534 MW gross in total.

The median age of its operating units is 2.0 years, against 39.0 for the whole operating fleet.

Its 1 finished unit with construction and grid dates took a median 5.4 years to build, against 6.0 across all finished reactors.

State Power Investment Corporation is the vendor of 2 reactor design lines (CAP1400 and CAP1000), covering 48 units on record, 1 of them operating.

How these are worked out: shares and ranks use the world totals cited in the table, and only named companies are ranked (unnamed or country-level entries in a source are not). A facility with no stated capacity is counted as a facility but adds nothing to a capacity figure. Vendor figures count operating units where this company is the recorded reactor vendor; ages count from the start-up year on record, and build times run from construction start to grid connection, as on the age and build-times pages.

Design lines

DesignGenerationCapacityOperatingUnits
CAP1400 III+ 1500 MWe gross 1 10
CAP1000 III+ 1250 MWe gross - 38

Installed base

UnitCountryStatusModelGross MWOnline
Shidao Bay nuclear power plant 2-1 China Operating CAP1400 1,534 2024
Shidao Bay nuclear power plant 2-2 China Under construction CAP1400 1,534 -
Bailong nuclear power plant 1-1 China Under construction CAP1000 1,254 2030
Haiyang nuclear power plant 2-3 China Under construction CAP1000 1,253 2027
Haiyang nuclear power plant 2-4 China Under construction CAP1000 1,253 2027
Sanmen nuclear power plant 2-3 China Under construction CAP1000 1,251 -
Sanmen nuclear power plant 2-4 China Under construction CAP1000 1,251 -
Lufeng nuclear power plant 1 China Under construction CAP1000 1,250 -
Lufeng nuclear power plant 2 China Under construction CAP1000 1,250 -
Lianjiang nuclear power plant 1-1 China Under construction CAP1000 1,224 -
Lianjiang nuclear power plant 1-2 China Under construction CAP1000 1,224 -
Laiyang nuclear power plant 1-1 China Announced CAP1400 1,543 2032
Laiyang nuclear power plant 1-2 China Announced CAP1400 1,543 2032
Bailong nuclear power plant 3 China Announced CAP1400 1,400 -
Bailong nuclear power plant 4 China Announced CAP1400 1,400 -
Bailong nuclear power plant 5 China Announced CAP1400 1,400 -
Bailong nuclear power plant 6 China Announced CAP1400 1,400 -
İğneada nuclear power plant 3 Türkiye Announced CAP1400 1,400 -
İğneada nuclear power plant 4 Türkiye Announced CAP1400 1,400 -
Bailong nuclear power plant 1-2 China Pre-construction CAP1000 1,250 -
Guangshui nuclear power plant 1 China Cancelled (inferred) CAP1000 1,250 -
Guangshui nuclear power plant 2 China Cancelled (inferred) CAP1000 1,250 -
Guangshui nuclear power plant 3 China Cancelled (inferred) CAP1000 1,250 -
Guangshui nuclear power plant 4 China Cancelled (inferred) CAP1000 1,250 -
Haifeng nuclear power plant 1 China Cancelled (inferred) CAP1000 1,250 -
Haifeng nuclear power plant 2 China Cancelled (inferred) CAP1000 1,250 -
Haiyang nuclear power plant 3-5 China Pre-construction CAP1000 1,250 2028
Haiyang nuclear power plant 3-6 China Pre-construction CAP1000 1,250 -
Hengren nuclear power plant 1 China Cancelled (inferred) CAP1000 1,250 -
Hengren nuclear power plant 2 China Cancelled (inferred) CAP1000 1,250 -
Hengren nuclear power plant 3 China Cancelled (inferred) CAP1000 1,250 -
Hengren nuclear power plant 4 China Cancelled (inferred) CAP1000 1,250 -
Lianjiang nuclear power plant 3 China Announced CAP1000 1,250 -
Lianjiang nuclear power plant 4 China Announced CAP1000 1,250 -
Lianjiang nuclear power plant 5 China Announced CAP1000 1,250 -
Lianjiang nuclear power plant 6 China Announced CAP1000 1,250 -
Pulandian nuclear power plant 1 China Cancelled (inferred) CAP1000 1,250 -
Pulandian nuclear power plant 2 China Cancelled (inferred) CAP1000 1,250 -
Pulandian nuclear power plant 3 China Cancelled (inferred) CAP1000 1,250 -
Pulandian nuclear power plant 4 China Cancelled (inferred) CAP1000 1,250 -
Xiaomoshan nuclear power plant 5 China Cancelled (inferred) CAP1000 1,250 -
Xiaomoshan nuclear power plant 6 China Cancelled (inferred) CAP1000 1,250 -
Yibin Beijiang nuclear power plant 1 China Cancelled (inferred) CAP1000 1,250 -
Yibin Beijiang nuclear power plant 2 China Cancelled (inferred) CAP1000 1,250 -
Yingtan nuclear power plant 1-1 China Cancelled (inferred) CAP1000 1,250 -
Yingtan nuclear power plant 1-2 China Cancelled (inferred) CAP1000 1,250 -
Yingtan nuclear power plant 3 China Cancelled (inferred) CAP1000 1,250 -
Yingtan nuclear power plant 4 China Cancelled (inferred) CAP1000 1,250 -

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.