Cigéo

repository France planned

Cigéo is a repository facility operated by Andra in France. Its capacity is not publicly disclosed.

France reprocesses, so what Cigéo would take is vitrified waste rather than intact fuel assemblies. The construction licence application went in during January 2023, the regulator gave a favourable opinion in December 2025, and a public inquiry is scheduled for the second half of 2026. Commissioning is not expected before 2050.

Facility
StageBack end
OperatorAndra
CountryFrance
Capacity not disclosed
Figure applies to
Note on the figureFor vitrified high-level and long-lived intermediate-level waste, not bare spent fuel.
Statusplanned
Commissionednot stated
Coordinates48.4900, 5.1400
Position in the chain

No disclosed capacity, so its share of world repository capacity cannot be stated.

Other repository facilities

FacilityCapacityStatus
Yucca Mountain 70,000tHM total closed
Onkalo not disclosed construction
Forsmark spent fuel repository (KBS-3) not disclosed construction
Canadian deep geological repository not disclosed planned
Nördlich Lägern not disclosed planned
Waste Isolation Pilot Plant not disclosed operating