Skip to content

Ust-Kuyga nuclear power plant 2

Announced Russia Small
Gross capacity
55MW

Ust-Kuyga nuclear power plant 2 is a pressurised water reactor unit at Ust-Kuyga nuclear power plant in Russia rated at 55 MW gross. It is announced. Construction started 1 Jan 2024.

Specification
Reactor type Pressurised water reactor (PWR)
ModelRITM-200N
SizeSmall300 MWe or less
CoolantLight water
ModeratorLight water
Gross capacity55MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
NSSS vendorRosatomall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteUst-Kuyga nuclear power plant
Unit2
CountryRussia
OwnerRosatom100%
Coordinates 69.9963, 135.5713approximate
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 2024Construction start

Other units at Ust-Kuyga nuclear power plant

UnitStatusGross MW
Ust-Kuyga nuclear power plant 1 Pre-construction 55

Other RITM-200N units

6 units worldwide share this model designation.

UnitCountryStatusGross MW
Jizzakh nuclear power plant 1 Uzbekistan Under construction 55
Jizzakh nuclear power plant 2 Uzbekistan Under construction 55
Kyrgyzstan nuclear power plant 1 Kyrgyzstan Announced 55
Kyrgyzstan nuclear power plant 2 Kyrgyzstan Announced 55
Ust-Kuyga nuclear power plant 1 Russia Pre-construction 55

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.