Tihange nuclear power plant 1

Retired Belgium
Gross capacity
1,009MW

Tihange nuclear power plant 1 is a pressurised water reactor unit at Tihange nuclear power plant in Belgium rated at 1,009 MW gross. It is retired. Commercial operation began 1 Oct 1975.

Corrected against a later source

Permanently shut down on 1 October 2025 at the end of its extended licence, after the GNPT record was last researched in May 2024.

status: operating → retired · IAEA Power Reactor Information System, reactor record TIHANGE-1 · verified 2026-09-06

Permanently shut down on 1 October 2025 at the end of its extended licence, after the GNPT record was last researched in May 2024.

permanent_shutdown: not set → 2025-10-01 · IAEA Power Reactor Information System, reactor record TIHANGE-1 · verified 2026-09-06

Permanently shut down on 1 October 2025 at the end of its extended licence, after the GNPT record was last researched in May 2024.

retirement_year: not set → 2025 · IAEA Power Reactor Information System, reactor record TIHANGE-1 · verified 2026-09-06

Specification
Reactor type Pressurised water reactor (PWR)
ModelFramatome 3 loops reactor
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,009MW
Net capacity (reference)962MW
Net capacity (design)870MW
Thermal output2,873MWt
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteTihange nuclear power plant
Unit1
CountryBelgium
OwnerEngie Electrabel100%
OperatorEngie Electrabel
Coordinates 50.5334, 5.2714
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jun 1970Construction start
  2. 21 Feb 1975First criticality
  3. 7 Mar 1975Grid connection
  4. 1 Oct 1975Commercial operation
  5. 1 Oct 2025Permanent shutdown

Other units at Tihange nuclear power plant

UnitStatusGross MW
Tihange nuclear power plant 2 Retired 1,055
Tihange nuclear power plant 3 Operating 1,089

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.