THTR-300 nuclear power plant
Retired Germany
Gross capacity
308MW
THTR-300 nuclear power plant is a high-temperature gas reactor unit at THTR-300 nuclear power plant in Germany rated at 308 MW gross. It is retired. Commercial operation began 1 Jun 1987.
Specification
| Reactor type | High-temperature gas reactor (HTGR) |
|---|---|
| Model | Pebble bed reactor |
| Size class | Large |
| Coolant | Helium |
| Moderator | Graphite |
| Gross capacity | 308MW |
| Net capacity (reference) | 296MW |
| Net capacity (design) | 296MW |
| Thermal output | 760MWt |
| Typical enrichment | 8–20% U-235, frequently HALEU |
Ownership & location
| Site | THTR-300 nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Germany |
| Owner | Hochtemperatur-Kernkraftwerk GmbH100% |
| Operator | Hochtemperatur-Kernkraftwerk |
| Coordinates | 51.6803, 7.9720 |
Fuel chain for this unit
Fuel form
TRISO-coated particle fuel in pebbles or compacts
Enrichment
8–20% U-235, frequently HALEU HALEU dependency
Who makes this assembly
- BWX Technologies TRISO particle fuel
- X-energy TRISO particle fuel, HALEU enrichment
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
This design needs HALEU — enrichment above 5%. Western production is currently measured in hundreds of kilograms a year.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 3 May 1971Construction start
- 13 Sep 1983First criticality
- 16 Nov 1985Grid connection
- 1 Jun 1987Commercial operation
- 29 Sep 1988Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-14
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted