Tatar nuclear power plant Original 2

Cancelled Russia
Gross capacity
950MW

Tatar nuclear power plant Original 2 is a pressurised water reactor unit at Tatar nuclear power plant in Russia rated at 950 MW gross. It is cancelled. Construction started 1 May 1988.

Specification
Reactor type Pressurised water reactor (PWR)
Modelnot disclosed
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity950MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteTatar nuclear power plant
UnitOriginal 2
CountryRussia
OperatorRosenergoatom
Coordinates 55.4518, 51.2901
Cancelled1990
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 May 1988Construction start

Other units at Tatar nuclear power plant

UnitStatusGross MW
Tatar nuclear power plant 1 Cancelled 1,250
Tatar nuclear power plant 2 Cancelled 1,255
Tatar nuclear power plant Original 1 Cancelled 950

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.