SM-1 nuclear power plant
SM-1 nuclear power plant is a pressurised water reactor unit at SM-1 nuclear power plant in United States rated at 2 MW gross. It is retired. Commercial operation began 1 Jan 1957.
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size | Very small20 MWe or less |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 2MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | not on record |
| Typical enrichment | 3–5% U-235 |
| Site | SM-1 nuclear power plant |
|---|---|
| Unit | not stated |
| Country | United States |
| Owner | US Department of Defense100% |
| Operator | United States Army |
| Coordinates | 38.6765, -77.1466 |
- China National Nuclear Corporation PWR fuel assemblies
- ENUSA Industrias Avanzadas PWR and BWR fuel assemblies
- Framatome PWR fuel assemblies
- KEPCO Nuclear Fuel PWR fuel assemblies
- Mitsubishi Heavy Industries PWR fuel assemblies
- Westinghouse Electric Company PWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 5 Oct 1955Construction start
- 8 Apr 1957First criticality
- 1 Jan 1957Grid connection
- 1 Jan 1957Commercial operation
- 16 Mar 1973Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-29
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data