Sinpo nuclear power plant 2

Cancelled North Korea
Gross capacity
1,000MW

Sinpo nuclear power plant 2 is a pressurised water reactor unit at Sinpo nuclear power plant in North Korea rated at 1,000 MW gross. It is cancelled. Construction started 1 Jan 1990.

Specification
Reactor type Pressurised water reactor (PWR)
Modelnot disclosed
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,000MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichment3–5% U-235
Ownership & location
SiteSinpo nuclear power plant
Unit2
CountryNorth Korea
OwnerKorean Peninsula Energy Development Organization100%
Coordinates 40.0947, 128.3409
Cancelled2006
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 1990Construction start

Other units at Sinpo nuclear power plant

UnitStatusGross MW
Sinpo nuclear power plant 1 Cancelled 1,000