Krasnoyarsk nuclear power plant 1
Krasnoyarsk nuclear power plant 1 is a pressurised water reactor unit at Krasnoyarsk nuclear power plant in Russia rated at 1,255 MW gross. It is announced. Commercial operation began 1 Jan 2037.
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200/V-510 |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,255MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| NSSS vendor | Rosatomall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | Krasnoyarsk nuclear power plant |
|---|---|
| Unit | 1 |
| Country | Russia |
| Coordinates | 56.0032, 92.8399approximate |
- TVEL Fuel Company VVER fuel assemblies
- Westinghouse Electric Company VVER-compatible fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Jan 2037Commercial operation
Other units at Krasnoyarsk nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Krasnoyarsk nuclear power plant 2 | Announced | 1,255 |
| Krasnoyarsk nuclear power plant 3 | Announced | 1,255 |
| Krasnoyarsk nuclear power plant 4 | Announced | 1,255 |
Other VVER-1200/V-510 units
6 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Krasnoyarsk nuclear power plant 2 | Russia | Announced | 1,255 |
| Krasnoyarsk nuclear power plant 3 | Russia | Announced | 1,255 |
| Krasnoyarsk nuclear power plant 4 | Russia | Announced | 1,255 |
| Novocherkassk nuclear power plant 1 | Russia | Announced | 1,200 |
| Novocherkassk nuclear power plant 2 | Russia | Announced | 1,200 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-07-07
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted