Khmelnitski nuclear power plant 3

Pre-construction Ukraine
Gross capacity
1,089MW

Khmelnitski nuclear power plant 3 is a pressurised water reactor unit at Khmelnitski nuclear power plant in Ukraine rated at 1,089 MW gross. It is pre-construction. Construction started 1 Mar 1986.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,089MW
Net capacity (reference)1,035MW
Net capacity (design)1,035MW
Thermal output3,132MWt
NSSS vendorRosatomall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteKhmelnitski nuclear power plant
Unit3
CountryUkraine
OwnerSE NNEGC "Energoatom"100%
OperatorSE NNEGC "Energoatom"
Coordinates 50.3024, 26.6473
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Mar 1986Construction start

Other units at Khmelnitski nuclear power plant

UnitStatusGross MW
Khmelnitski nuclear power plant 1 Operating 1,000
Khmelnitski nuclear power plant 2 Operating 1,000
Khmelnitski nuclear power plant 4 Pre-construction 1,089
Khmelnitski nuclear power plant 5 Pre-construction 1,250
Khmelnitski nuclear power plant 6 Pre-construction 1,250

Other VVER units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Khmelnitski nuclear power plant 4 Ukraine Pre-construction 1,089

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.