Japan Power Demonstration Reactor nuclear power plant is a boiling water reactor unit at Japan Power Demonstration Reactor nuclear power plant in Japan rated at 13 MW gross. It is retired. Commercial operation began 15 Mar 1965.
| Reactor type | Boiling water reactor (BWR) |
|---|---|
| Model | BWR-1 |
| Size | Very small20 MWe or less |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 13MW |
| Net capacity (reference) | 12MW |
| Net capacity (design) | 10MW |
| Thermal output | 90MWt |
| NSSS vendor | GE Vernova Hitachi Nuclear Energyall vendors |
| Typical enrichment | 3–5% U-235 |
| Site | Japan Power Demonstration Reactor nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Japan |
| Owner | Japan Atomic Energy Agency100% |
| Operator | Japan Atomic Energy Agency |
| Coordinates | 36.4568, 140.6059approximate |
- Framatome BWR fuel assemblies
- Global Nuclear Fuel BWR fuel assemblies
- Westinghouse Electric Company BWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 Dec 1960Construction start
- 22 Aug 1963First criticality
- 26 Oct 1963Grid connection
- 15 Mar 1965Commercial operation
- 18 Mar 1976Permanent shutdown
Other BWR-1 units
2 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Garigliano nuclear power plant | Italy | Retired | 160 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-16
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data