Gross capacity
460MW

Fukushima Daiichi nuclear power plant 1 is a boiling water reactor unit at Fukushima Daiichi nuclear power plant in Japan rated at 460 MW gross. It is retired. Commercial operation began 26 Mar 1971.

Specification
Reactor type Boiling water reactor (BWR)
ModelBWR-3
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity460MW
Net capacity (reference)439MW
Net capacity (design)439MW
Thermal output1,380MWt
Typical enrichment3–5% U-235
Ownership & location
SiteFukushima Daiichi nuclear power plant
Unit1
CountryJapan
OwnerTokyo Electric Power Co100%
OperatorTokyo Electric Power
Coordinates 37.4231, 141.0331
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 25 Jul 1967Construction start
  2. 10 Oct 1970First criticality
  3. 17 Nov 1970Grid connection
  4. 26 Mar 1971Commercial operation
  5. 19 May 2011Permanent shutdown

Other units at Fukushima Daiichi nuclear power plant

Other BWR-3 units

3 units worldwide share this model designation.

UnitCountryStatusGross MW
Santa Maria De Garona nuclear power plant Spain Retired 466
Shimane nuclear power plant 1 Japan Retired 460

Sources