Skip to content

Fangchenggang nuclear power plant 2-4

Operating China
Gross capacity
1,180MW

Fangchenggang nuclear power plant 2-4 is a pressurised water reactor unit at Fangchenggang nuclear power plant in China rated at 1,180 MW gross. It is operating. Commercial operation began 25 May 2024.

Corrected against a later source

GNPT gives a grid connection of 25 May 2024 and a commercial operation date of 1 January 2024, which is before it. The World Nuclear Association database lists first grid connection on 9 April 2024 and commercial operation on 25 May 2024, so the May date is the commercial one.

grid_connection: 2024-05-25 → 2024-04-09 · World Nuclear Association, Nuclear Reactor Database, Fangchenggang 4 · verified 2026-10-22

GNPT gives a grid connection of 25 May 2024 and a commercial operation date of 1 January 2024, which is before it. The World Nuclear Association database lists first grid connection on 9 April 2024 and commercial operation on 25 May 2024, so the May date is the commercial one.

commercial_operation: 2024-01-01 → 2024-05-25 · World Nuclear Association, Nuclear Reactor Database, Fangchenggang 4 · verified 2026-10-22

Specification
Reactor type Pressurised water reactor (PWR)
ModelHPR-1000
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,180MW
Net capacity (reference)1,000MW
Net capacity (design)1,000MW
Thermal output3,150MWt
NSSS vendorChina National Nuclear Corporationall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteFangchenggang nuclear power plant
Unit2-4
CountryChina
OwnerGuangxi Fangchenggang CGN Nuclear Power Industry Investment Co Ltd100%
OperatorGuangxi Fangchenggang Nuclear Power
Coordinates 21.6697, 108.5571
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 23 Dec 2016Construction start
  2. 3 Apr 2024First criticality
  3. 9 Apr 2024Grid connection
  4. 25 May 2024Commercial operation

Other units at Fangchenggang nuclear power plant

Other HPR-1000 units

66 units worldwide share this model designation.

UnitCountryStatusGross MW
Cangnan San'ao nuclear power plant 1-1 China Operating 1,215
Fangchenggang nuclear power plant 2-3 China Operating 1,180
Fuqing nuclear power plant 5 China Operating 1,161
Fuqing nuclear power plant 6 China Operating 1,150
Taipingling nuclear power plant 1-1 China Operating 1,200
Zhangzhou nuclear power plant 1-1 China Operating 1,212
Zhangzhou nuclear power plant 1-2 China Operating 1,212
Cangnan San'ao nuclear power plant 1-2 China Under construction 1,210
Cangnan San'ao nuclear power plant 2-3 China Under construction 1,215
Cangnan San'ao nuclear power plant 2-4 China Pre-construction 1,150
Cangnan San'ao nuclear power plant 3-5 China Announced 1,150
Cangnan San'ao nuclear power plant 3-6 China Announced 1,150

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try