El Dabaa nuclear power plant 4

Under construction Egypt
Gross capacity
1,200MW

El Dabaa nuclear power plant 4 is a pressurised water reactor unit at El Dabaa nuclear power plant in Egypt rated at 1,200 MW gross. It is under construction. Commercial operation began 1 Jan 2030.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER-1200/V-529
SizeLargeabove 300 MWe
CoolantLight water
ModeratorLight water
Gross capacity1,200MW
Net capacity (reference)1,100MW
Net capacity (design)1,100MW
Thermal output3,200MWt
NSSS vendorRosatomall vendors
Typical enrichment3–5% U-235
Ownership & location
SiteEl Dabaa nuclear power plant
Unit4
CountryEgypt
OwnerNuclear Power Plants Authority100%
Coordinates 31.0442, 28.4978
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 23 Jan 2024Construction start
  2. 1 Jan 2030Commercial operation

Other units at El Dabaa nuclear power plant

UnitStatusGross MW
El Dabaa nuclear power plant 1 Under construction 1,200
El Dabaa nuclear power plant 2 Under construction 1,200
El Dabaa nuclear power plant 3 Under construction 1,200

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.