Skip to content
nuclearchain

Dungeness nuclear power plant C

Cancelled United Kingdom
Gross capacity
1,650MW

Dungeness nuclear power plant C is a nuclear unit at Dungeness nuclear power plant in United Kingdom rated at 1,650 MW gross. It is cancelled.

Specification
Reactor type not disclosed
Modelnot disclosed
Size classnot disclosed
Coolantnot disclosed
Moderatornot disclosed
Gross capacity1,650MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichmentnot disclosed
Ownership & location
SiteDungeness nuclear power plant
UnitC
CountryUnited Kingdom
OwnerEDF Energy Ltd100%
Coordinates 50.9139, 0.9620approximate
Cancelled2017
Fuel chain for this unit
Fuel form
not established for this unit's type
Enrichment
not established
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Other units at Dungeness nuclear power plant

Sources