Connecticut Yankee nuclear power plant
Connecticut Yankee nuclear power plant is a pressurised water reactor unit at Connecticut Yankee nuclear power plant in United States rated at 603 MW gross. It is retired. Commercial operation began 1 Jan 1968.
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 603MW |
| Net capacity (reference) | 560MW |
| Net capacity (design) | 582MW |
| Thermal output | 1,825MWt |
| NSSS vendor | not on record |
| Typical enrichment | 3–5% U-235 |
| Site | Connecticut Yankee nuclear power plant |
|---|---|
| Unit | not stated |
| Country | United States |
| Owner | Connecticut Yankee Atomic Power Co100% |
| Operator | Connecticut Yankee Atomic Power |
| Coordinates | 41.4829, -72.5003 |
- China National Nuclear Corporation PWR fuel assemblies
- ENUSA Industrias Avanzadas PWR and BWR fuel assemblies
- Framatome PWR fuel assemblies
- KEPCO Nuclear Fuel PWR fuel assemblies
- Mitsubishi Heavy Industries PWR fuel assemblies
- Westinghouse Electric Company PWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 1 May 1964Construction start
- 24 Jul 1967First criticality
- 7 Aug 1967Grid connection
- 1 Jan 1968Commercial operation
- 5 Dec 1996Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-29
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data