Bushehr nuclear power plant 2
Bushehr nuclear power plant 2 is a pressurised water reactor unit at Bushehr nuclear power plant in Iran rated at 1,057 MW gross. It is under construction. Commercial operation began 1 Jan 2029.
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | V-528 VVER-1000 AES-92 GIII+ |
| Size | Largeabove 300 MWe |
| Coolant | Light water |
| Moderator | Light water |
| Gross capacity | 1,057MW |
| Net capacity (reference) | 974MW |
| Net capacity (design) | 974MW |
| Thermal output | 3,012MWt |
| NSSS vendor | not on record |
| Typical enrichment | 3–5% U-235 |
| Site | Bushehr nuclear power plant |
|---|---|
| Unit | 2 |
| Country | Iran |
| Owner | Nuclear Power Production And Development CO Of Iran100% |
| Operator | Nuclear Power Production And Development CO Of Iran |
| Coordinates | 28.8296, 50.8860 |
- China National Nuclear Corporation PWR fuel assemblies
- ENUSA Industrias Avanzadas PWR and BWR fuel assemblies
- Framatome PWR fuel assemblies
- KEPCO Nuclear Fuel PWR fuel assemblies
- Mitsubishi Heavy Industries PWR fuel assemblies
- Westinghouse Electric Company PWR fuel assemblies
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Timeline
- 27 Sep 2019Construction start
- 1 Jan 2029Commercial operation
Other units at Bushehr nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Bushehr nuclear power plant 1 | 1,000 | |
| Bushehr nuclear power plant 3 | Pre-construction | 1,057 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-18
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data