Boiling Nuclear Superheater (BONUS) nuclear power plant

Retired Puerto Rico Very small
Gross capacity
18MW

Boiling Nuclear Superheater (BONUS) nuclear power plant is a boiling water reactor unit at Boiling Nuclear Superheater (BONUS) nuclear power plant in Puerto Rico rated at 18 MW gross. It is retired. Commercial operation began 1 Sep 1965.

Specification
Reactor type Boiling water reactor (BWR)
ModelSuperheater
SizeVery small20 MWe or less
CoolantLight water
ModeratorLight water
Gross capacity18MW
Net capacity (reference)17MW
Net capacity (design)17MW
Thermal output50MWt
NSSS vendornot on record
Typical enrichment3–5% U-235
Ownership & location
SiteBoiling Nuclear Superheater (BONUS) nuclear power plant
Unitnot stated
CountryPuerto Rico
OwnerUS DOE and Puerto Rico Electric Power Authority100%
OperatorUS Department of Energy
Puerto Rico Water Resources
Coordinates 18.3652, -67.2687
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units, utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 1960Construction start
  2. 13 Apr 1964First criticality
  3. 14 Aug 1964Grid connection
  4. 1 Sep 1965Commercial operation
  5. 1 Jun 1968Permanent shutdown

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.