AVR Reactor nuclear power plant
AVR Reactor nuclear power plant is a high-temperature gas reactor unit at AVR Reactor nuclear power plant in Germany rated at 15 MW gross. It is retired. Commercial operation began 19 May 1969.
| Reactor type | High-temperature gas reactor (HTGR) |
|---|---|
| Model | Pebble bed reactor prototype |
| Size | Very small20 MWe or less |
| Coolant | Helium |
| Moderator | Graphite |
| Gross capacity | 15MW |
| Net capacity (reference) | 13MW |
| Net capacity (design) | 13MW |
| Thermal output | 46MWt |
| NSSS vendor | not on record |
| Typical enrichment | 8–20% U-235, frequently HALEU |
| Site | AVR Reactor nuclear power plant |
|---|---|
| Unit | not stated |
| Country | Germany |
| Owner | Arbeitsgemeinschaft Versuchsreaktor GmbH100% |
| Operator | Arbeitsgemeinschaft Versuchsreaktor |
| Coordinates | 50.9026, 6.4208 |
- BWX Technologies TRISO particle fuel
- X-energy TRISO particle fuel, HALEU enrichment
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
This design needs HALEU, enrichment above 5%. Western production is currently measured in hundreds of kilograms a year.
Timeline
- 1 Aug 1961Construction start
- 16 Aug 1966First criticality
- 17 Dec 1967Grid connection
- 19 May 1969Commercial operation
- 31 Dec 1988Permanent shutdown
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-14
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data