Angra nuclear power plant 3

Under construction Brazil
Gross capacity
1,405MW

Angra nuclear power plant 3 is a pressurised water reactor unit at Angra nuclear power plant in Brazil rated at 1,405 MW gross. It is under construction. Commercial operation began 1 Jan 2031.

Specification
Reactor type Pressurised water reactor (PWR)
ModelPRE KONVOI
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,405MW
Net capacity (reference)1,340MW
Net capacity (design)1,340MW
Thermal output3,900MWt
Typical enrichment3–5% U-235
Ownership & location
SiteAngra nuclear power plant
Unit3
CountryBrazil
OwnerEletrobras Eletronuclear SA100%
OperatorEletrobras Eletronuclear
Coordinates -23.0091, -44.4720
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 30 May 2010Construction start
  2. 1 Jan 2031Commercial operation

Other units at Angra nuclear power plant

UnitStatusGross MW
Angra nuclear power plant 1 Operating 640
Angra nuclear power plant 2 Operating 1,350

Other PRE KONVOI units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Angra nuclear power plant 2 Brazil Operating 1,350